Laws of heat exchange refer to the fundamental principles governing the transfer of heat between two bodies.
Heat always flows from a hotter body to a colder body
The rate of heat transfer is proportional to the temperature difference between the two bodies
The rate of heat transfer is proportional to the surface area of contact between the two bodies
The rate of heat transfer is inversely proportional to the distance betw...
Top trending discussions
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
posted on 5 Feb 2021
I applied via Company Website and was interviewed before Feb 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
About how to make achieve a process in different types of products and how to perform in beyond on work.
In Which code of product is processing immediately note down the concerned register and it's specific time vs actual time mention in the register.
posted on 29 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
Calculating quantities involves measuring dimensions, applying formulas, and considering material properties for accurate estimations.
Measure dimensions: Use tools like tape measures or laser distance meters to get accurate lengths, widths, and heights.
Apply formulas: For example, to calculate the volume of concrete needed, use the formula: Volume = Length x Width x Height.
Consider waste factors: Always account for mat...
Yes, I can create PRW (Project Resource Work) bills, ensuring accurate tracking of project costs and resources.
Understand the project scope and resource requirements.
Gather data on labor, materials, and overhead costs.
Use software tools like Excel or project management software for calculations.
Ensure compliance with company policies and project budgets.
Example: Creating a PRW bill for a construction project by detaili...
If the instrument is shifted, the elevation remains the same at EL 1683 unless adjusted for instrument height.
Elevation Level (EL): EL 1683 indicates the height above a reference point, typically sea level.
Instrument Shift: Shifting the instrument does not change the elevation of the point being measured unless the instrument's height is altered.
Example: If the instrument is moved horizontally but remains at the same h...
Yes, I can create a bar bending schedule to optimize reinforcement in construction projects.
A bar bending schedule (BBS) lists the type, quantity, and dimensions of reinforcement bars needed.
It helps in estimating material requirements and costs effectively.
For example, in a slab, I would specify the number of bars, their lengths, and bending details.
BBS also aids in ensuring compliance with design specifications and s...
posted on 16 Jul 2021
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
posted on 2 Jan 2021
I applied via Referral and was interviewed in Jul 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Area Sales Manager
96
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Regional Sales Manager
51
salaries
| ₹11 L/yr - ₹14 L/yr |
Assistant Manager
25
salaries
| ₹4.8 L/yr - ₹7.8 L/yr |
Senior Sales Executive
23
salaries
| ₹3.8 L/yr - ₹6 L/yr |
Senior Manager
19
salaries
| ₹9.2 L/yr - ₹16.6 L/yr |
J K Fenner
Saudi Binladin Group
McNally Bharat Engineering
Bahwan Engineering