To work on CNC, one needs to have knowledge of programming, tool selection, machine setup, and maintenance.
Learn programming languages such as G-code and M-code
Understand tool selection and how to set up the machine accordingly
Ensure proper maintenance of the machine to avoid breakdowns
Regularly check and calibrate the machine to ensure accuracy
Practice safety measures while working with CNC machines
Top trending discussions
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
Unit weight of steel is typically around 7850 kg/m^3.
Unit weight of steel is commonly expressed in kg/m^3.
The unit weight of steel can vary depending on the type of steel being used.
For example, the unit weight of mild steel is approximately 7850 kg/m^3.
Shuttering level can be checked using a spirit level to ensure it is horizontal or vertical.
Use a spirit level to check if the shuttering is horizontal or vertical
Ensure the bubble in the spirit level is centered to indicate level
Adjust the shuttering as needed to achieve the correct level
Check multiple points along the shuttering to ensure consistency
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
posted on 19 Feb 2022
English awareness
I applied via Naukri.com and was interviewed before May 2021. There were 4 interview rounds.
General Discussion,, Expectation of Management
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Sep 2018. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Aims to increase efficiency and reduce costs
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
based on 1 review
Rating in categories
Area Sales Manager
87
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Regional Sales Manager
36
salaries
| ₹11 L/yr - ₹14 L/yr |
Assistant Manager
25
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Senior Sales Executive
23
salaries
| ₹3.8 L/yr - ₹6 L/yr |
Senior Manager
19
salaries
| ₹4.9 L/yr - ₹15 L/yr |
Greenply
CenturyPly
Merino Industries
Riddhi Siddhi Gluco Biols