i
Shaily Engineering Plastics Ltd
Filter interviews by
I applied via Referral and was interviewed in Jul 2020. There were 4 interview rounds.
Top trending discussions
posted on 9 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
The flow of complete PCB design involves schematic design, component placement, routing, design verification, and manufacturing.
Schematic design: Create a schematic diagram of the circuit layout.
Component placement: Position components on the PCB layout.
Routing: Connect the components using traces on the PCB.
Design verification: Check for errors and ensure functionality.
Manufacturing: Prepare the design for production.
PCB assembly in speedometer involves soldering electronic components onto a printed circuit board to ensure accurate readings.
Ensure proper placement of components on the PCB
Use soldering techniques to securely attach components
Test the functionality of the speedometer after assembly
Follow manufacturer's guidelines for assembly process
PCB work in speedometer involves designing and implementing the circuitry for accurate speed measurement and display in a full function tester.
Designing PCB layout for speedometer circuitry
Implementing accurate speed measurement sensors
Integrating display functionality in full function tester
Testing and calibrating speedometer functionality
Pcb knowledge in smt and psmt department
posted on 2 Aug 2024
I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.
Gk and all questions related to to mechanical
I specialize in optimizing production processes, implementing cost-saving measures, and improving overall efficiency.
Optimizing production processes to increase output
Implementing cost-saving measures to reduce expenses
Improving overall efficiency to enhance productivity
I applied via Referral and was interviewed in Jun 2023. There was 1 interview round.
My expected salary is based on my experience, skills, industry standards, and the responsibilities of the role.
Consider my years of experience in the industry
Take into account the specific skills and qualifications I bring to the role
Research industry standards for similar positions
Factor in the responsibilities and expectations of the job
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I would like to discuss my salary expectations in person during the negotiation phase.
Express willingness to discuss salary expectations in person
Highlight the importance of negotiation phase
Avoid giving a specific salary figure without further discussion
My family background is diverse and has influenced my perspective and values.
My parents come from different cultural backgrounds, which has exposed me to different traditions and perspectives.
My father is an engineer, and my mother is a teacher, which has instilled in me a passion for both education and problem-solving.
I have siblings who are pursuing careers in various fields, such as medicine and business, which has ...
I worked as a Production Engineer at XYZ Company.
Managed production processes and ensured smooth operations.
Developed and implemented strategies to optimize production efficiency.
Collaborated with cross-functional teams to identify and resolve production issues.
Monitored and analyzed production data to identify areas for improvement.
Implemented quality control measures to ensure product standards were met.
Trained and s...
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Types of boilers include fire tube, water tube, and electric boilers. Boilers function to generate steam or hot water for heating or power generation. Various welding processes include TIG, MIG, and stick welding. Various NDT processes include ultrasonic testing, radiography, and magnetic particle testing.
Types of boilers: fire tube, water tube, electric boilers
Functions of boilers: generate steam or hot water for heat...
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Production Engineer
81
salaries
| ₹2.7 L/yr - ₹5.5 L/yr |
Quality Engineer
52
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Tool Room Engineer
47
salaries
| ₹2.5 L/yr - ₹5 L/yr |
QC Engineer
45
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Senior Production Engineer
41
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Thermax Limited
Lakshmi Machine Works
Wipro Infrastructure Engineering
Kirloskar Oil Engines