Hot runner is used in mould to maintain the temperature of the plastic material and prevent wastage.
Prevents wastage of plastic material
Maintains consistent temperature of plastic material
Reduces cycle time of injection molding process
Improves quality of final product
Examples: automotive parts, medical devices, consumer goods
Top trending discussions
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2023. There were 4 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2019. There was 1 interview round.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Production Engineer
77
salaries
| ₹2.7 L/yr - ₹5.1 L/yr |
Quality Engineer
52
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Tool Room Engineer
47
salaries
| ₹2.5 L/yr - ₹5 L/yr |
QC Engineer
45
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Senior Production Engineer
42
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |