Bending moment is a measure of the bending force applied to a structural element. Weight of MS pipe and bar can vary based on size and density of construction materials.
Bending moment is a measure of the bending force experienced by a structural element.
It is calculated by multiplying the force applied to the element by the distance from the point of force application to the point of interest.
The weight of MS pipe and ...
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
posted on 10 Nov 2021
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 28 Dec 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.
The current market labour rate and material price can vary depending on location, demand, and supply.
Labour rates can be influenced by factors such as skill level, experience, and union agreements.
Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.
It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater
based on 19 reviews
Rating in categories
Deputy Manager
54
salaries
| ₹6.5 L/yr - ₹19.4 L/yr |
Assistant Manager
52
salaries
| ₹5.5 L/yr - ₹14.5 L/yr |
Project Engineer
50
salaries
| ₹3 L/yr - ₹9 L/yr |
Senior Project Engineer
34
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Chief Manager
28
salaries
| ₹15 L/yr - ₹30.1 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries