Upload Button Icon Add office photos

Angelique International

Compare button icon Compare button icon Compare

Filter interviews by

Angelique International Project Engineer Interview Questions and Answers

Updated 8 Feb 2021

Angelique International Project Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Feb 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. About Tunnelling
  • Q2. BBS
  • Q3. Deep invert kikker lineing
  • Q4. HRT Desanding chambers Feeder tunnel GOC SFT etc.
  • Q5. Tunnel maintenance

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tendering department design department survey department questions are asked from project enginner

Interview Preparation Tips

Interview preparation tips for other job seekers - For engineer post questions are asked about survey department in core, then questions are asked about designing department, then about tendering department and when your department came like engg. They just minimise their questions
When questions are asked from 4 departments and you are only good in one department. Then your moral automatically came down
I had a question to all those project managers how could your 20+ years experience will be matched to 5 years experience of the candidates
And if you don’t want to select any candidate why you waste yours and candidate time . Just pick your referrals and finish the game.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. 1. Tell me about your self. 2. About qualification.
  • Q2. 1. Previous experience. 2. Benefits and facilities from previous company. Etc
Round 3 - Technical 

(3 Questions)

  • Q1. 1- They asking structure related questions. 2 - Finishing, Flooring, tile installation procedure.
  • Q2. 3- Bending moment? 4- weight of ms pipe, MS bar & Density of construction materials.
  • Ans. 

    Bending moment is a measure of the bending force applied to a structural element. Weight of MS pipe and bar can vary based on size and density of construction materials.

    • Bending moment is a measure of the bending force experienced by a structural element.

    • It is calculated by multiplying the force applied to the element by the distance from the point of force application to the point of interest.

    • The weight of MS pipe and ...

  • Answered by AI
  • Q3. 5 - Quality and MEP basic questions. Etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Fully prepare for interview, because they can ask anything from your experience and engineering books.
You have to prepare following these:
* All the Density of construction materials.
* Drawing reading and scale check of drawings.
* Full knowledge about Foundation, structure and finishing work.

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you

Interview Questionnaire 

1 Question

  • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

Interview Preparation Tips

Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Role and responsibility of Project Manager
  • Q2. Describe Launching of O.W. Girder

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Railway project
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous company name,
  • Ans. Shapoorji pallonji and company private limited
  • Answered by DARSHAN N
Round 3 - Technical 

(10 Questions)

  • Q1. About the previous project
  • Q2. All civil execution questions
  • Q3. About the mivan shuttering
  • Q4. About the rate analysis
  • Q5. About the bar bending
  • Q6. Current market labour rate and material price
  • Ans. 

    The current market labour rate and material price can vary depending on location, demand, and supply.

    • Labour rates can be influenced by factors such as skill level, experience, and union agreements.

    • Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.

    • It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater

  • Answered by AI
  • Q7. Quality assurance and control
  • Q8. Cast controlling and micro schedule
  • Q9. Project men material tools equipments management
  • Q10. Structural and finishing
Round 4 - Salary  

(3 Questions)

  • Q1. What's your current salary
  • Q2. What's your expectations
  • Q3. How soon can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. More on operational concerns

Interview Preparation Tips

Interview preparation tips for other job seekers - get your best in the beginning, later nothing happens
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Calculations and Automotive steering system design

Angelique International Interview FAQs

How to prepare for Angelique International Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Angelique International. The most common topics and skills that interviewers at Angelique International expect are Communication Skills and MS Office.
What are the top questions asked in Angelique International Project Engineer interview?

Some of the top questions asked at the Angelique International Project Engineer interview -

  1. HRT Desanding chambers Feeder tunnel GOC SFT et...read more
  2. Deep invert kikker line...read more
  3. About Tunnell...read more

Tell us how to improve this page.

Angelique International Project Engineer Salary
based on 50 salaries
₹3 L/yr - ₹9 L/yr
11% less than the average Project Engineer Salary in India
View more details

Angelique International Project Engineer Reviews and Ratings

based on 19 reviews

4.8/5

Rating in categories

4.5

Skill development

4.8

Work-life balance

4.8

Salary

4.0

Job security

4.8

Company culture

4.6

Promotions

4.8

Work satisfaction

Explore 19 Reviews and Ratings
Deputy Manager
54 salaries
unlock blur

₹6.5 L/yr - ₹19.4 L/yr

Assistant Manager
52 salaries
unlock blur

₹5.5 L/yr - ₹14.5 L/yr

Project Engineer
50 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Senior Project Engineer
34 salaries
unlock blur

₹3.8 L/yr - ₹10 L/yr

Chief Manager
28 salaries
unlock blur

₹15 L/yr - ₹30.1 L/yr

Explore more salaries
Compare Angelique International with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

Adani Group

3.9
Compare

Reliance Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview