Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.
They gave a test accordingly your job
For which position you applied and gave test a group of team discussion about you knowledge of that position and responsibilities
I expect high standards and am dedicated to achieving them.
I have high expectations for myself and my team
I am dedicated to delivering quality work
I am committed to continuous improvement
I prioritize meeting deadlines and targets
I am dedicated to building strong relationships with clients and stakeholders
I am confident that my future with the company will be successful and fulfilling.
I believe that my skills and experience make me a strong fit for the role of Manager Accounts.
I am excited about the company's growth prospects and the opportunities it presents.
I am committed to contributing to the company's success and achieving my professional goals.
I have a track record of delivering results and building strong relatio...
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Foundation work involves sinking wells. Challenges include tilt and shift of well. Rectification methods include bottom plugging and cassion methodology.
Foundation work involves sinking wells
Challenges faced include tilt and shift of well
Rectification methods include bottom plugging and cassion methodology
Bottom plugging involves filling the bottom of the well with concrete or other materials to stabilize it
Cassion met...
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
posted on 20 Feb 2024
I applied via Campus Placement and was interviewed before Feb 2023. There was 1 interview round.
There are various types of steel, each with different properties and uses.
Carbon Steel: Contains varying amounts of carbon, used in construction and manufacturing.
Alloy Steel: Contains additional elements like nickel or chromium for improved strength and durability.
Stainless Steel: Contains chromium for corrosion resistance, commonly used in kitchen appliances and medical instruments.
Tool Steel: Designed for making too...
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
based on 1 interview
Interview experience
Assistant Manager
58
salaries
| ₹5.5 L/yr - ₹14.5 L/yr |
Project Engineer
50
salaries
| ₹3 L/yr - ₹9 L/yr |
Deputy Manager
45
salaries
| ₹4.4 L/yr - ₹16.5 L/yr |
Senior Project Engineer
34
salaries
| ₹3.8 L/yr - ₹10 L/yr |
Chief Manager
28
salaries
| ₹15 L/yr - ₹30.1 L/yr |
Simplex Infrastructures
Sterling & Wilson
Aarvee Associates
Nasser S. Al Hajri Corporation