Upload Button Icon Add office photos

Angelique International

Compare button icon Compare button icon Compare

Filter interviews by

Angelique International Deputy General Manager Interview Questions and Answers

Updated 16 Jun 2022

Angelique International Deputy General Manager Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. - Asked past experiences and job locations, so replied satisfactory. - Asked about Project Management and have ever used for your Projects, replied satisfactory and extra features of PM over and above the ...

Interview Preparation Tips

Topics to prepare for Angelique International Deputy General Manager interview:
  • Tell about yourself and your and
  • Your Strength and weaknesses
Interview preparation tips for other job seekers - First of all, please build your CV honestly in such a way that CV reflects your credibility to be considered for the Applied Position.
Then give your work summary in short with bullet points.
Your job start period and end period should be clearly indicated.
Maintain the year/month period in order/ Chronological and should not be randomly.
Applicant details ( Name, Current / last position , Contact numbers, Email ID and Current CTC and Expect CTC ) need to be mentioned.
( - Salary expected to be mentioned with upper and lower ranges and maintain with max of about 30% hike to Current salary drawn.
- Mention negotiable salary since the person has to learn many things as salary is not mandatory. This kind of reply impress positive feelings to the interviewers )

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Education and previous work details

Interview Preparation Tips

Interview preparation tips for other job seekers - Very friendly cooperation.

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself... Past Experiences.. Current ctc... Expected ctc...
Round 2 - Technical 

(1 Question)

  • Q1. Well foundation work.. Current role... Challenges faced during sinking of well. How to rectify tilt and shift of well. Methodology of bottom plugging. Methodology of cassion of well.
  • Ans. 

    Foundation work involves sinking wells. Challenges include tilt and shift of well. Rectification methods include bottom plugging and cassion methodology.

    • Foundation work involves sinking wells

    • Challenges faced include tilt and shift of well

    • Rectification methods include bottom plugging and cassion methodology

    • Bottom plugging involves filling the bottom of the well with concrete or other materials to stabilize it

    • Cassion met...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updated about your current role very well.

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

10 Questions

  • Q1. We will give only salary, no facilities, no guest house , no HRA, they keep only container at site no office building, transport one car 9 people sitting, no timings, heavy politics
  • Q2. Why to use 24/7 watsapp so many groups messages ?
  • Ans. 

    24/7 WhatsApp groups messages are essential for effective communication and quick decision-making.

    • WhatsApp groups allow for instant communication and collaboration among team members

    • 24/7 availability ensures that urgent matters can be addressed promptly

    • Group messages allow for sharing of important information and updates

    • Reduces the need for lengthy email chains and phone calls

    • Increases efficiency and productivity

    • Exampl...

  • Answered by AI
  • Q3. When you conduct meating with , why you not share MOM and distribute checklist, decsion/ changes taken in meetings if you dont deliver to ground workers , what is pupose of meeting?
  • Q4. Organogram designations should be in this way ,(keypersons) TL, DTL, desiner, planner, contract administrator, surveyor , architect, (profeessional staff ) qs engineer, qc engineer but here TL , Construct...
  • Q5. When nught shifts food not available
  • Ans. 

    Alternative food options will be provided for night shifts.

    • We understand the importance of providing food for our employees, especially during night shifts.

    • We will ensure that alternative food options are available for our employees during night shifts.

    • This may include providing pre-packaged meals or snacks, or arranging for food delivery services.

    • We will work with our employees to ensure that their dietary needs and p...

  • Answered by AI
  • Q6. They will listen only toTL only and no feedback from lower staff
  • Q7. Officer managers, document controller ,office boy , sweepers are not there
  • Q8. No place to eat in the afternoon
  • Q9. No sharing technical codes/training from head office
  • Q10. Politics are heavy

Interview Preparation Tips

Interview preparation tips for other job seekers - be honest
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Rate analysis for building Items
  • Ans. 

    Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.

    • Rate analysis helps in determining the cost of each building item based on material and labor costs.

    • It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.

    • Rate analysis helps in estimating the total project cost accurately.

    • For ex...

  • Answered by AI
  • Q2. Material Rates of building materials
  • Ans. 

    Material rates of building materials vary based on factors like location, quality, and demand.

    • Material rates can vary based on the location of the construction site.

    • The quality of the building materials can also impact the rates.

    • Demand for certain materials can cause fluctuations in prices.

    • For example, the rate of cement in urban areas may be higher compared to rural areas.

    • Higher quality bricks may cost more than lower...

  • Answered by AI
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Nothing just basic information and then they are conducting technical round based on your profile or department

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience

Interview Questionnaire 

4 Questions

  • Q1. What will you do when material is not received in time at site ?
  • Ans. 

    I will assess the situation and take necessary actions to minimize the impact on the project timeline.

    • Check with the supplier for the reason of delay and expected delivery date

    • Evaluate the impact on the project timeline and inform the project team

    • Explore alternative options such as sourcing from a different supplier or adjusting the project schedule

    • Communicate the revised plan to all stakeholders and ensure timely deli...

  • Answered by AI
  • Q2. How do you manage the team ?
  • Ans. Should maintain proper communication between team members. Good planning assists allocation of work responsibilities to team members, also it avoids irrational approach and duplication of works. As a best team player can complete the project within a specified time and budget.
  • Answered Anonymously
  • Q3. How do you calculate the cement and sand for 1 sqm cm 1:4?
  • Ans. 

    To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

    • The ratio of cement to sand is 1:4

    • Calculate the total volume of the mixture, which is 1 sqm cm

    • Divide the total volume by the sum of the ratio (1+4=5)

    • Multiply the quotient by the individual ratio to get the volume of cement and sand

    • Convert the volume to weight using the de

  • Answered by AI
  • Q4. What is price escalation?
  • Ans. 

    Price escalation refers to the increase in the price of goods or services over time.

    • It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.

    • Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.

    • For example, the price of gasoline may escalate due to an increase in the cost of c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are majorly from technical side as per your experience and civil Engineering subjects. Some of the questions related to IS Codes.

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is my strength?
  • Ans. 

    My strength is my ability to lead and motivate a team towards achieving goals.

    • Effective communication skills

    • Strong decision-making abilities

    • Ability to delegate tasks efficiently

    • Positive attitude towards challenges

    • Experience in managing teams

    • Motivational skills

    • Goal-oriented mindset

  • Answered by AI
  • Q2. What is my weakness?

Interview Preparation Tips

Topics to prepare for Ramky Infrastructure Assistant Manager interview:
  • Technicals
Interview preparation tips for other job seekers - Give interview confidently and they do a much of bargaining in salary. So stay in your demand.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Material procurement
  • Q2. Different types of steel
  • Ans. 

    There are various types of steel, each with different properties and uses.

    • Carbon Steel: Contains varying amounts of carbon, used in construction and manufacturing.

    • Alloy Steel: Contains additional elements like nickel or chromium for improved strength and durability.

    • Stainless Steel: Contains chromium for corrosion resistance, commonly used in kitchen appliances and medical instruments.

    • Tool Steel: Designed for making too...

  • Answered by AI

Angelique International Interview FAQs

How many rounds are there in Angelique International Deputy General Manager interview?
Angelique International interview process usually has 2 rounds. The most common rounds in the Angelique International interview process are Resume Shortlist and Technical.
How to prepare for Angelique International Deputy General Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Angelique International. The most common topics and skills that interviewers at Angelique International expect are Commissioning, EHS, Electricals, Execution and Heading.

Tell us how to improve this page.

Angelique International Deputy General Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tractebel Interview Questions
4.1
 • 42 Interviews
Neilsoft Interview Questions
3.5
 • 41 Interviews
View all
Angelique International Deputy General Manager Salary
based on 20 salaries
₹21.5 L/yr - ₹45 L/yr
6% less than the average Deputy General Manager Salary in India
View more details

Angelique International Deputy General Manager Reviews and Ratings

based on 5 reviews

4.9/5

Rating in categories

3.7

Skill development

4.5

Work-life balance

4.9

Salary

4.5

Job security

4.9

Company culture

4.8

Promotions

4.9

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
58 salaries
unlock blur

₹5.5 L/yr - ₹14.5 L/yr

Project Engineer
50 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Deputy Manager
45 salaries
unlock blur

₹4.4 L/yr - ₹16.5 L/yr

Senior Project Engineer
34 salaries
unlock blur

₹3.8 L/yr - ₹10 L/yr

Chief Manager
28 salaries
unlock blur

₹15 L/yr - ₹30.1 L/yr

Explore more salaries
Compare Angelique International with

Simplex Infrastructures

3.4
Compare

Sterling & Wilson

4.1
Compare

Aarvee Associates

3.9
Compare

Nasser S. Al Hajri Corporation

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview