I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
I was interviewed before Mar 2024.
posted on 23 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.
Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.
DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
The project involves managing the development of a new mobile application for a retail company.
Coordinating with the development team to ensure timely delivery of the app
Creating and managing project timelines and milestones
Collaborating with stakeholders to gather requirements and feedback
Monitoring and controlling project budget and resources
I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.
based on 2 interviews
Interview experience
based on 15 reviews
Rating in categories
Software Engineer
174
salaries
| ₹1.8 L/yr - ₹11.5 L/yr |
Senior Design Engineer
113
salaries
| ₹4 L/yr - ₹15 L/yr |
Project Lead
110
salaries
| ₹6.4 L/yr - ₹15 L/yr |
Senior Engineer
106
salaries
| ₹5 L/yr - ₹12 L/yr |
Design Engineer
105
salaries
| ₹2.4 L/yr - ₹10 L/yr |
LTIMindtree
HCLTech
Tech Mahindra
Wipro