Upload Button Icon Add office photos

ASM Technologies

Compare button icon Compare button icon Compare

Filter interviews by

ASM Technologies Project Lead Interview Questions and Answers

Updated 24 May 2024

ASM Technologies Project Lead Interview Experiences

3 interviews found

Project Lead Interview Questions & Answers

user image Anonymous

posted on 24 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Calculations and Automotive steering system design

Project Lead Interview Questions & Answers

user image Syed Israr

posted on 4 Sep 2023

Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Feed, detail engineering, equipment data sheets, PID PFD, equipment selection , TBE.
Round 3 - One-on-one 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your engineering basics good

Project Lead Interview Questions Asked at Other Companies

Q1. PowerBuilder 1. How to build app in one click? 2. How to read dat ... read more
Q2. 1. What is API Testing 2. HTTP error codes 3. How to test API 4. ... read more
Q3. How many TV can a new company expect to sell in delhi region
asked in Fingent
Q4. How did I handle requests that were not part of agreed scope?
asked in CDK Global
Q5. How would you do annual performance reviews and minimize conflict ... read more

Project Lead Interview Questions & Answers

user image PRASHANT WALKE

posted on 20 Jun 2021

Interview Questionnaire 

1 Question

  • Q1. Sheet metal theory, Previous company experience,K factor,Sheet metal manufacturing processes

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Role and responsibility of Project Manager
  • Q2. Describe Launching of O.W. Girder

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Railway project
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Mar 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Distribution buisness working process
  • Q2. Billing process
  • Q3. CTC process
  • Q4. Planning scope
Round 2 - HR 

(2 Questions)

  • Q1. Last salary withdrawal
  • Q2. Certificate details

Interview Preparation Tips

Interview preparation tips for other job seekers - Having same job experience makes 70 percent yes, having little reference makes 100%
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. HydroTest of DI and HDPE pipe
  • Ans. 

    Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.

    • Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.

    • DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bhai Vegetarian food allowed hai no nonveg food allowed. Aur Daru cigrette nahi pite to company tumhare baap ki samjho .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculated pump head
  • Ans. 

    Pump head is calculated by adding the static head, friction head, and velocity head.

    • Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.

    • Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.

    • Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...

  • Answered by AI
  • Q2. How to oprate the fire alaram system
  • Ans. 

    To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.

    • Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.

    • Evacuate the building immediately using the nearest exit and do not use elevators.

    • Wait for emergency responders to arrive and provide them with any relevant information about the situation.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If existing staff learn to junior company growth will not held up
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Post Project related
  • Q2. Present project description
  • Ans. 

    The project involves managing the development of a new mobile application for a retail company.

    • Coordinating with the development team to ensure timely delivery of the app

    • Creating and managing project timelines and milestones

    • Collaborating with stakeholders to gather requirements and feedback

    • Monitoring and controlling project budget and resources

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be right always
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tendering department design department survey department questions are asked from project enginner

Interview Preparation Tips

Interview preparation tips for other job seekers - For engineer post questions are asked about survey department in core, then questions are asked about designing department, then about tendering department and when your department came like engg. They just minimise their questions
When questions are asked from 4 departments and you are only good in one department. Then your moral automatically came down
I had a question to all those project managers how could your 20+ years experience will be matched to 5 years experience of the candidates
And if you don’t want to select any candidate why you waste yours and candidate time . Just pick your referrals and finish the game.

ASM Technologies Interview FAQs

How many rounds are there in ASM Technologies Project Lead interview?
ASM Technologies interview process usually has 2 rounds. The most common rounds in the ASM Technologies interview process are One-on-one Round, Resume Shortlist and Technical.
How to prepare for ASM Technologies Project Lead interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ASM Technologies. The most common topics and skills that interviewers at ASM Technologies expect are .Net, Automation, CATIA, Design and MySQL.
What are the top questions asked in ASM Technologies Project Lead interview?

Some of the top questions asked at the ASM Technologies Project Lead interview -

  1. Feed, detail engineering, equipment data sheets, PID PFD, equipment selection ,...read more
  2. Calculations and Automotive steering system des...read more

Tell us how to improve this page.

ASM Technologies Project Lead Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
ASM Technologies Project Lead Salary
based on 110 salaries
₹6.4 L/yr - ₹15 L/yr
37% less than the average Project Lead Salary in India
View more details

ASM Technologies Project Lead Reviews and Ratings

based on 15 reviews

3.2/5

Rating in categories

2.7

Skill development

3.6

Work-life balance

3.2

Salary

3.0

Job security

3.1

Company culture

2.5

Promotions

2.9

Work satisfaction

Explore 15 Reviews and Ratings
Software Engineer
174 salaries
unlock blur

₹1.8 L/yr - ₹11.5 L/yr

Senior Design Engineer
113 salaries
unlock blur

₹4 L/yr - ₹15 L/yr

Project Lead
110 salaries
unlock blur

₹6.4 L/yr - ₹15 L/yr

Senior Engineer
106 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Design Engineer
105 salaries
unlock blur

₹2.4 L/yr - ₹10 L/yr

Explore more salaries
Compare ASM Technologies with

LTIMindtree

3.8
Compare

HCLTech

3.5
Compare

Tech Mahindra

3.5
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview