i
OPPO
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Production related issues can include equipment breakdowns, supply chain disruptions, and quality control problems.
Equipment breakdowns can cause delays and halt production entirely.
Supply chain disruptions can lead to shortages of raw materials or finished products.
Quality control problems can result in defective products and damage to the company's reputation.
Other issues may include inefficient processes, safety haz...
This question is asking me to respond quickly and without hesitation.
I understand the importance of quick thinking in a production engineering role
I will take a moment to gather my thoughts before responding
I will provide a clear and concise answer to the best of my ability
I applied via Naukri.com
7QC tools, 6S, 4M, 3R, Poka Yoke, Kaizen, CAPPA, PPM, UPH, and cycle time are all important concepts in production engineering.
7QC tools are quality control tools used to identify and solve production problems.
6S is a methodology for workplace organization and standardization.
4M stands for Man, Machine, Material, and Method and is used to identify the root cause of production problems.
3R stands for Reduce, Reuse, and R...
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
OPPO interview questions for designations
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
Get interview-ready with Top OPPO Interview Questions
Top trending discussions
I applied via Campus Placement and was interviewed before Dec 2019. There were 6 interview rounds.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2019. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specific period (e.g. 8 hours per day)
Determine the customer demand for that same period (e.g. 400 units per day)
Divide the total available production time by the customer demand to get the takt time (e.g. 8 hours / 400 units = 0.02 hours per unit)
When a machine stops working, immediate actions should be taken to diagnose and fix the issue to minimize downtime.
Check for any error messages or indicators on the machine
Inspect the machine for any visible damage or loose connections
Refer to the machine's manual for troubleshooting steps
Contact the maintenance team or a technician for assistance if needed
Implement a backup plan to ensure production is not significant
I am looking for a long-term career opportunity and plan to stay with the company for the foreseeable future.
I am committed to contributing to the company's success and growth over the long term.
I am interested in professional development opportunities within the company.
I plan to build strong relationships with colleagues and stakeholders to ensure a successful and fulfilling career.
I am open to discussing potential c...
based on 3 interviews
1 Interview rounds
based on 86 reviews
Rating in categories
Sales Executive
607
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
493
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
349
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
310
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
220
salaries
| ₹0 L/yr - ₹0 L/yr |
Xiaomi
Samsung
Vivo
OnePlus