I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.
Managed site development projects from concept to completion
Designed infrastructure systems such as stormwater management and utilities
Performed construction management duties to ensure projects were completed on time and within budget
Collaborated with architects, co...
Various types of works executed by a Civil Site Engineer include site preparation, earthwork, foundation construction, structural work, and finishing work.
Site preparation involves clearing, grading, and leveling the site for construction.
Earthwork includes excavation, backfilling, and compaction of soil for building foundations.
Foundation construction involves laying the base for the structure to ensure stability and ...
Top trending discussions
I was interviewed in Jan 2025.
posted on 18 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
I was interviewed in Dec 2024.
posted on 3 May 2023
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
posted on 22 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
It was very good , they give certain time to prepare yourself
It's basically arithmetic and reasoning test
The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.
The nominal size of a brick is typically larger than its actual size to account for mortar joints.
Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.
It is important to consider the nominal size when planning and designing brickwork pr
Admixtures are added to concrete to alter its properties or enhance its performance.
Admixtures can improve workability, durability, strength, and set time of concrete
Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers
Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.
Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.
Determine the spacing required for the spiral stirrups based on design specifications.
Multiply the circumference of the pile by the number of required spiral stirrups to get the total...
Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.
Axial load is the force that acts along the longitudinal axis of the column.
It is important to consider axial load in column design to ensure structural stability.
Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.
posted on 20 Feb 2022
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
M30 concrete is a type of high-strength concrete with a compressive strength of 30 MPa.
M30 concrete is commonly used in construction projects that require high strength and durability.
It is made by mixing cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement, sand, and aggregates in M30 concrete is 1:1:2.
M30 concrete is suitable for building structures like bridges, dams, and high-rise buildings.
I...
The rebar grade should be selected based on the design requirements and the structural load capacity.
The rebar grade is determined by the design engineer based on the structural requirements.
The grade of rebar is usually specified in the structural drawings and specifications.
The most commonly used rebar grades are 40, 60, and 75.
The higher the grade of rebar, the stronger it is and the more load it can bear.
The rebar ...
I was interviewed in Dec 2024.
Yes, I have consistently maintained standard quality in my previous company by following industry best practices and ensuring compliance with regulations.
Implemented quality control measures to ensure compliance with project specifications
Regularly conducted quality inspections and audits to identify and address any issues
Collaborated with project team members to address quality concerns and make necessary improvements
...
Yes, I use drawing software like AutoCAD and technology like GPS in my work.
I use drawing software like AutoCAD to create detailed plans and designs for construction projects.
I utilize technology like GPS to accurately survey and map out sites for construction.
Drawing and technology help me streamline the design and construction process, leading to more efficient and precise results.
I prioritize tasks, set goals, use time management tools, and maintain a healthy work-life balance.
Prioritize tasks based on deadlines and importance
Set specific goals and create a schedule to achieve them
Use time management tools such as calendars, to-do lists, and reminders
Maintain a healthy work-life balance by setting boundaries and taking breaks
Delegate tasks when necessary to avoid burnout
Examples: Using project ...
Calculator for material quantity on site material
Quantity of a specific item or material is calculated by multiplying the dimensions and density of the material.
Calculate volume by multiplying length, width, and height
Determine density of the material
Multiply volume by density to get quantity
For example, to calculate quantity of concrete needed for a slab, multiply slab dimensions by density of concrete
I use a combination of document review, site visits, and communication with stakeholders to verify information.
Reviewing project documents such as drawings, specifications, and reports
Conducting site visits to physically inspect the work and verify conditions
Communicating with project team members, clients, and contractors to clarify information
Utilizing surveying and testing equipment to validate data
Cross-referencing...
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
37
salaries
| ₹5.4 L/yr - ₹10.8 L/yr |
Tunnel Engineer
21
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Civil Engineer
19
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Surveyor
18
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Senior Engineer
16
salaries
| ₹5 L/yr - ₹8.5 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM