Round 1 - HR 

(2 Questions)

  • Q1. What are the types of bricks ?
  • Ans. 

    Types of bricks include clay bricks, concrete bricks, sand lime bricks, and engineering bricks.

    • Clay bricks: made from clay and fired in a kiln

    • Concrete bricks: made from concrete and cured in a controlled environment

    • Sand lime bricks: made from sand, lime, and fly ash

    • Engineering bricks: high-strength bricks used in structural applications

  • Answered by AI
  • Q2. What is the size of morter brick wall?
  • Ans. 

    The size of a mortar brick wall can vary depending on the type of bricks used and the desired thickness of the mortar joints.

    • The standard size of a brick is 8 inches by 4 inches by 2 1/4 inches.

    • The thickness of mortar joints typically ranges from 3/8 inch to 1/2 inch.

    • Therefore, the size of a mortar brick wall can be calculated by adding the dimensions of the bricks and the mortar joints.

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Rithwik Projects Interview FAQs

How many rounds are there in Rithwik Projects Construction Supervisor interview?
Rithwik Projects interview process usually has 1 rounds. The most common rounds in the Rithwik Projects interview process are HR.
What are the top questions asked in Rithwik Projects Construction Supervisor interview?

Some of the top questions asked at the Rithwik Projects Construction Supervisor interview -

  1. What is the size of morter brick wa...read more
  2. What are the types of brick...read more

Tell us how to improve this page.

Rithwik Projects Construction Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 768 Interviews
AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
View all
Assistant Manager
40 salaries
unlock blur

₹5.4 L/yr - ₹10.8 L/yr

Office Administrator
23 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Tunnel Engineer
21 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Civil Engineer
20 salaries
unlock blur

₹2.4 L/yr - ₹6.8 L/yr

Surveyor
18 salaries
unlock blur

₹2.2 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Rithwik Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview