Types of bricks include clay bricks, concrete bricks, sand lime bricks, and engineering bricks.
Clay bricks: made from clay and fired in a kiln
Concrete bricks: made from concrete and cured in a controlled environment
Sand lime bricks: made from sand, lime, and fly ash
Engineering bricks: high-strength bricks used in structural applications
The size of a mortar brick wall can vary depending on the type of bricks used and the desired thickness of the mortar joints.
The standard size of a brick is 8 inches by 4 inches by 2 1/4 inches.
The thickness of mortar joints typically ranges from 3/8 inch to 1/2 inch.
Therefore, the size of a mortar brick wall can be calculated by adding the dimensions of the bricks and the mortar joints.
Top trending discussions
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 26 Sep 2023
Questions upon aptitude.
Project details with cost.
posted on 29 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.
EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.
It helps in measuring project performance against the baseline plan and identifying variances.
Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 29 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Labor cost can be calculated by multiplying the total hours worked by the labor rate.
Determine the total hours worked by each laborer
Identify the labor rate per hour
Multiply the total hours worked by the labor rate to get the labor cost
Consider any additional costs such as benefits or overtime pay
Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.
Determine the quantity of each material needed for the project
Obtain the unit cost of each material
Multiply the quantity of each material by its unit cost to get the total cost
Add up the total cost of all materials to get the overall material cost
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 11 Aug 2021
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
based on 1 interview
Interview experience
Assistant Manager
37
salaries
| ₹5.4 L/yr - ₹10.8 L/yr |
Tunnel Engineer
21
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Civil Engineer
20
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Surveyor
18
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Senior Engineer
17
salaries
| ₹5 L/yr - ₹8.5 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM