Types of bricks include clay bricks, concrete bricks, sand lime bricks, and engineering bricks.
Clay bricks: made from clay and fired in a kiln
Concrete bricks: made from concrete and cured in a controlled environment
Sand lime bricks: made from sand, lime, and fly ash
Engineering bricks: high-strength bricks used in structural applications
The size of a mortar brick wall can vary depending on the type of bricks used and the desired thickness of the mortar joints.
The standard size of a brick is 8 inches by 4 inches by 2 1/4 inches.
The thickness of mortar joints typically ranges from 3/8 inch to 1/2 inch.
Therefore, the size of a mortar brick wall can be calculated by adding the dimensions of the bricks and the mortar joints.
Top trending discussions
posted on 14 Nov 2024
I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.
Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.
Plan the layout of the pipes based on the project requirements and specifications.
Excavate the trench to the required depth and width to accommodate the pipe.
Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.
Backfill the trench with suitable material to provide support and...
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 26 Sep 2023
Questions upon aptitude.
Project details with cost.
posted on 29 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.
EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.
It helps in measuring project performance against the baseline plan and identifying variances.
Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...
posted on 30 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.
Job specific questions.
The load taken by a single weld tick depends on various factors such as the type of weld, material being welded, and welding technique.
The load taken by a single weld tick can vary depending on the type of weld being used (e.g. fillet weld, groove weld, plug weld).
The material being welded also plays a significant role in determining the load capacity of a single weld tick.
The welding technique and quality of the weld ...
posted on 30 Sep 2023
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
Reinforcement of concrete involves adding materials like steel bars to increase its strength and durability.
Reinforcement helps to prevent cracking and increase load-bearing capacity.
Common reinforcement materials include steel bars, mesh, and fibers.
Reinforcement is typically placed in areas of concrete that are prone to tension or bending forces.
Proper placement and spacing of reinforcement is crucial for effective r...
Designing a steel structure involves determining the appropriate materials, dimensions, and connections to ensure structural integrity and safety.
Consider the load-bearing requirements of the structure
Select the appropriate grade of steel based on strength and durability
Calculate the dimensions of beams, columns, and connections to meet safety standards
Ensure proper bracing and support to prevent buckling or collapse
Co...
posted on 29 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Labor cost can be calculated by multiplying the total hours worked by the labor rate.
Determine the total hours worked by each laborer
Identify the labor rate per hour
Multiply the total hours worked by the labor rate to get the labor cost
Consider any additional costs such as benefits or overtime pay
Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.
Determine the quantity of each material needed for the project
Obtain the unit cost of each material
Multiply the quantity of each material by its unit cost to get the total cost
Add up the total cost of all materials to get the overall material cost
Interview experience
Assistant Manager
37
salaries
| ₹5.4 L/yr - ₹10.8 L/yr |
Civil Engineer
19
salaries
| ₹2.4 L/yr - ₹6.8 L/yr |
Tunnel Engineer
18
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Surveyor
16
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Senior Engineer
14
salaries
| ₹5 L/yr - ₹8.5 L/yr |
L&T Construction
L&T Energy Hydrocarbon
AECOM
Simplex Infrastructures