Filter interviews by
Types of bricks include clay bricks, concrete bricks, sand lime bricks, and engineering bricks.
Clay bricks: made from clay and fired in a kiln
Concrete bricks: made from concrete and cured in a controlled environment
Sand lime bricks: made from sand, lime, and fly ash
Engineering bricks: high-strength bricks used in structural applications
The size of a mortar brick wall can vary depending on the type of bricks used and the desired thickness of the mortar joints.
The standard size of a brick is 8 inches by 4 inches by 2 1/4 inches.
The thickness of mortar joints typically ranges from 3/8 inch to 1/2 inch.
Therefore, the size of a mortar brick wall can be calculated by adding the dimensions of the bricks and the mortar joints.
I have 5 years of experience in administration roles, including managing office operations and coordinating events.
I have 5 years of experience in administration roles
Managed office operations effectively
Coordinated events successfully
I worked at XYZ Corporation as an Administration Assistant.
Worked at XYZ Corporation as an Administration Assistant
Handled office administrative tasks such as scheduling meetings and managing office supplies
Assisted in organizing company events and coordinating with different departments
I applied via Approached by Company and was interviewed before Jan 2024. There was 1 interview round.
I am currently responsible for overseeing quality control processes, ensuring compliance with regulations, and implementing improvements.
Overseeing quality control processes
Ensuring compliance with regulations
Implementing improvements
Training staff on quality control procedures
The reporting hierarchy in our organization is structured with clear lines of authority and responsibility.
The reporting hierarchy starts with frontline employees who report to team leaders or supervisors.
Team leaders or supervisors report to department managers.
Department managers report to senior management or executives.
Senior management or executives report to the CEO or board of directors.
Regular communication and...
Design mix for concrete varies based on grade, with references from IS codes and project specifications.
Design mix for concrete is determined based on the required strength and durability of the structure.
References for design mix include IS 10262:2019 for concrete mix design, project specifications, and relevant codes and standards.
For example, M20 grade concrete typically has a mix proportion of 1:1.5:3 (cement:sand:
Various tests are conducted on concrete, shotcrete, soil, and embankment to ensure quality control.
Tests for concrete include compressive strength, slump test, and air content test.
Shotcrete tests involve assessing the thickness, density, and bond strength.
Soil tests include moisture content, compaction test, and grain size analysis.
Embankment tests focus on stability, settlement, and permeability.
Quality control ensur...
Operations involved in running a batching plant include material storage, weighing, mixing, and transportation of concrete.
Material storage: Aggregate, cement, water, and admixtures are stored in separate compartments to maintain quality.
Weighing: Precise measurement of materials is crucial for the desired concrete mix.
Mixing: Materials are combined in the correct proportions in the mixer to produce concrete.
Transporta...
A quality control plan for construction works outlines procedures and criteria to ensure that the project meets quality standards.
Identify quality standards and specifications for the project
Establish inspection and testing procedures at various stages of construction
Assign responsibilities to team members for quality control activities
Document all quality control activities and results
Implement corrective actions when...
I applied via Company Website and was interviewed in Mar 2024. There were 4 interview rounds.
Grouting is a process of filling gaps or voids in soil, rock, or concrete with a fluid material to improve strength or reduce permeability.
Grouting is commonly used in construction to stabilize foundations or fill cracks in concrete structures.
Types of grouting include cement grouting, chemical grouting, and pressure grouting.
Grouting materials can include cement, bentonite, epoxy, or polyurethane.
Grouting can also be ...
Rithwik Projects interview questions for popular designations
I was responsible for managing a team of sales representatives and developing strategies to increase sales revenue.
Managed a team of sales representatives
Developed strategies to increase sales revenue
Analyzed sales data to identify trends and opportunities
Collaborated with marketing team to create promotional campaigns
Get interview-ready with Top Rithwik Projects Interview Questions
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
In the absence of staff, I focus on inventory management, customer service, and store operations.
Managing inventory levels to ensure products are well-stocked
Providing excellent customer service to maintain customer satisfaction
Overseeing store operations and ensuring smooth functioning
Training new staff members to fill in for absent employees
The purpose of this work is to effectively manage the store operations, drive sales, and ensure customer satisfaction.
Ensure smooth store operations by managing inventory, scheduling staff, and overseeing daily tasks
Drive sales through effective merchandising, promotions, and customer service
Ensure customer satisfaction by addressing complaints, resolving issues, and providing a positive shopping experience
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
TDS monthly due date is typically the 7th of the following month.
TDS stands for Tax Deducted at Source.
The due date for TDS payment is usually the 7th of the following month in most cases.
Late payment of TDS can attract penalties and interest charges.
PO vs Invoice verification involves matching purchase orders with invoices to ensure accuracy and prevent fraud.
PO verification involves confirming that the goods or services ordered match the details on the purchase order.
Invoice verification involves checking that the invoice received matches the goods or services received and the prices agreed upon.
Discrepancies between POs and invoices should be resolved before pay...
Employer's share of Provident Fund contribution
Employer typically contributes 12% of employee's basic salary towards PF
This contribution is mandatory for all employees covered under the Employees' Provident Fund and Miscellaneous Provisions Act, 1952
Employer's share of PF is a part of the overall cost-to-company for the employer
Mess expenses are debited to the Mess Expenses account in the general ledger.
Debit the Mess Expenses account in the general ledger
Record the amount spent on mess expenses
Ensure proper documentation and approval for all mess expenses
Review and reconcile mess expenses regularly to ensure accuracy
I was interviewed in Oct 2023.
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
The process of change of scope involves evaluating the impact of proposed changes on project objectives, timeline, budget, and resources.
Identify the reason for the change in scope
Assess the impact on project objectives, timeline, budget, and resources
Obtain approval from stakeholders for the change
Update project documentation and communicate changes to the team
Monitor and control the implementation of the scope change
Top trending discussions
Some of the top questions asked at the Rithwik Projects interview -
The duration of Rithwik Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 45 interviews
Interview experience
based on 221 reviews
Rating in categories
Hyderabad / Secunderabad
10-16 Yrs
₹ 6-14 LPA
Hyderabad / Secunderabad
10-15 Yrs
₹ 6-14 LPA
Assistant Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Tunnel Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Surveyor
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon