Surveying is the practice of measuring and mapping the Earth's surface to determine the position, shape, and boundaries of land.
Surveying involves using various instruments and techniques to collect data about the land.
It is used in construction, engineering, and land development projects.
Surveyors use tools like total stations, GPS, and laser scanners to measure distances, angles, and elevations.
The collected data is ...
A surveyor is a professional who measures and maps land, buildings, and other physical features.
Uses specialized equipment to take precise measurements
Creates maps and plans for construction, engineering, and land development projects
Ensures compliance with local and national regulations
May specialize in areas such as geomatics, hydrographic surveying, or cadastral surveying
An automatic level is a surveying instrument used to measure height differences and level surfaces.
An automatic level uses a compensator to ensure accurate readings.
It is commonly used in construction, engineering, and land surveying.
The instrument is mounted on a tripod and has a telescope for sighting.
Automatic levels are often used to establish benchmarks and set elevations.
They can also be used for measuring slopes...
Surveying a boat involves measuring and assessing its physical characteristics and condition.
Surveying a boat is like a home inspection for a house.
It involves checking the boat's structure, systems, and equipment.
The surveyor will look for any defects or issues that could affect the boat's safety or value.
The survey report can be used for insurance, financing, or buying/selling purposes.
Total station is an electronic device used in surveying and construction to measure angles, distances, and elevations.
Combines theodolite and distance meter in one device
Used for accurate measurement of angles, distances, and elevations
Can be used for land surveying, construction, and engineering projects
Data can be downloaded to a computer for analysis and mapping
Examples: Leica TS13, Trimble S7, Sokkia CX
A surveyor's transit is a tool used to measure angles and distances in surveying.
It is a type of theodolite used for precise measurements
It has a telescope mounted on a tripod with a leveling mechanism
It can measure vertical and horizontal angles as well as distances
It is commonly used in construction and civil engineering projects
A vernier compass can adjust for magnetic declination and directly read true north.
Vernier compass has an adjustable scale for magnetic declination
Compass can be set to read true north directly
Helpful for accurate navigation
Used in surveying and outdoor activities
EDM stands for Electronic Distance Measurement, a technology used in surveying to measure distances accurately.
EDM uses electromagnetic waves to measure distances between two points.
It is faster and more accurate than traditional methods like tape measures.
EDM can be used in various surveying applications like construction, mapping, and land surveying.
Examples of EDM instruments include total stations and theodolites.
E...
RICS stands for Royal Institution of Chartered Surveyors.
It is a professional body for qualifications and standards in land, property, infrastructure, and construction.
It was founded in London in 1868.
It has over 134,000 members globally.
RICS provides education, training, and certification for surveyors and other property professionals.
It also sets ethical and technical standards for the profession.
RICS is recognized a...
Chain survey is a type of surveying method that uses a chain or tape to measure distances and angles.
It is a traditional method of surveying.
It involves a chain or tape to measure distances.
Angles are measured using a compass or theodolite.
It is used for small-scale surveys like land surveys.
Errors can occur due to sagging of the chain or tape.
Modern surveying methods like GPS have largely replaced chain surveying.
Leveling is the process of determining the height or elevation of a point relative to a reference point.
It involves the use of a leveling instrument such as a level or a theodolite.
The reference point is usually a benchmark or a known elevation point.
Leveling is used in construction, surveying, and engineering to ensure accuracy in measurements and to establish elevations for grading and drainage.
Types of leveling incl...
Surveying is the process of measuring and mapping the physical features of the earth.
Establishing control points
Taking measurements using various instruments
Creating maps and plans
Calculating areas and volumes
Providing data for construction and engineering projects
Types of bricks include clay bricks, concrete bricks, sand lime bricks, and engineering bricks.
Clay bricks: made from clay and fired in a kiln
Concrete bricks: made from concrete and cured in a controlled environment
Sand lime bricks: made from sand, lime, and fly ash
Engineering bricks: high-strength bricks used in structural applications
The size of a mortar brick wall can vary depending on the type of bricks used and the desired thickness of the mortar joints.
The standard size of a brick is 8 inches by 4 inches by 2 1/4 inches.
The thickness of mortar joints typically ranges from 3/8 inch to 1/2 inch.
Therefore, the size of a mortar brick wall can be calculated by adding the dimensions of the bricks and the mortar joints.
I have 5 years of experience in administration roles, including managing office operations and coordinating events.
I have 5 years of experience in administration roles
Managed office operations effectively
Coordinated events successfully
I worked at XYZ Corporation as an Administration Assistant.
Worked at XYZ Corporation as an Administration Assistant
Handled office administrative tasks such as scheduling meetings and managing office supplies
Assisted in organizing company events and coordinating with different departments
I applied via Approached by Company and was interviewed before Jan 2024.Β There was 1 interview round.
I am currently responsible for overseeing quality control processes, ensuring compliance with regulations, and implementing improvements.
Overseeing quality control processes
Ensuring compliance with regulations
Implementing improvements
Training staff on quality control procedures
The reporting hierarchy in our organization is structured with clear lines of authority and responsibility.
The reporting hierarchy starts with frontline employees who report to team leaders or supervisors.
Team leaders or supervisors report to department managers.
Department managers report to senior management or executives.
Senior management or executives report to the CEO or board of directors.
Regular communication and...
Design mix for concrete varies based on grade, with references from IS codes and project specifications.
Design mix for concrete is determined based on the required strength and durability of the structure.
References for design mix include IS 10262:2019 for concrete mix design, project specifications, and relevant codes and standards.
For example, M20 grade concrete typically has a mix proportion of 1:1.5:3 (cement:sand:
Various tests are conducted on concrete, shotcrete, soil, and embankment to ensure quality control.
Tests for concrete include compressive strength, slump test, and air content test.
Shotcrete tests involve assessing the thickness, density, and bond strength.
Soil tests include moisture content, compaction test, and grain size analysis.
Embankment tests focus on stability, settlement, and permeability.
Quality control ensur...
Operations involved in running a batching plant include material storage, weighing, mixing, and transportation of concrete.
Material storage: Aggregate, cement, water, and admixtures are stored in separate compartments to maintain quality.
Weighing: Precise measurement of materials is crucial for the desired concrete mix.
Mixing: Materials are combined in the correct proportions in the mixer to produce concrete.
Transporta...
A quality control plan for construction works outlines procedures and criteria to ensure that the project meets quality standards.
Identify quality standards and specifications for the project
Establish inspection and testing procedures at various stages of construction
Assign responsibilities to team members for quality control activities
Document all quality control activities and results
Implement corrective actions when...
Rithwik Projects interview questions for popular designations
I applied via Company Website and was interviewed in Mar 2024.Β There were 4 interview rounds.
Grouting is a process of filling gaps or voids in soil, rock, or concrete with a fluid material to improve strength or reduce permeability.
Grouting is commonly used in construction to stabilize foundations or fill cracks in concrete structures.
Types of grouting include cement grouting, chemical grouting, and pressure grouting.
Grouting materials can include cement, bentonite, epoxy, or polyurethane.
Grouting can also be ...
Get interview-ready with Top Rithwik Projects Interview Questions
I was responsible for managing a team of sales representatives and developing strategies to increase sales revenue.
Managed a team of sales representatives
Developed strategies to increase sales revenue
Analyzed sales data to identify trends and opportunities
Collaborated with marketing team to create promotional campaigns
I applied via Referral and was interviewed before Aug 2021.Β There was 1 interview round.
In the absence of staff, I focus on inventory management, customer service, and store operations.
Managing inventory levels to ensure products are well-stocked
Providing excellent customer service to maintain customer satisfaction
Overseeing store operations and ensuring smooth functioning
Training new staff members to fill in for absent employees
The purpose of this work is to effectively manage the store operations, drive sales, and ensure customer satisfaction.
Ensure smooth store operations by managing inventory, scheduling staff, and overseeing daily tasks
Drive sales through effective merchandising, promotions, and customer service
Ensure customer satisfaction by addressing complaints, resolving issues, and providing a positive shopping experience
I applied via Naukri.com and was interviewed in Jan 2024.Β There were 2 interview rounds.
TDS monthly due date is typically the 7th of the following month.
TDS stands for Tax Deducted at Source.
The due date for TDS payment is usually the 7th of the following month in most cases.
Late payment of TDS can attract penalties and interest charges.
PO vs Invoice verification involves matching purchase orders with invoices to ensure accuracy and prevent fraud.
PO verification involves confirming that the goods or services ordered match the details on the purchase order.
Invoice verification involves checking that the invoice received matches the goods or services received and the prices agreed upon.
Discrepancies between POs and invoices should be resolved before pay...
Employer's share of Provident Fund contribution
Employer typically contributes 12% of employee's basic salary towards PF
This contribution is mandatory for all employees covered under the Employees' Provident Fund and Miscellaneous Provisions Act, 1952
Employer's share of PF is a part of the overall cost-to-company for the employer
Mess expenses are debited to the Mess Expenses account in the general ledger.
Debit the Mess Expenses account in the general ledger
Record the amount spent on mess expenses
Ensure proper documentation and approval for all mess expenses
Review and reconcile mess expenses regularly to ensure accuracy
I appeared for an interview in Oct 2023.
I applied via Naukri.com and was interviewed in Nov 2023.Β There was 1 interview round.
The process of change of scope involves evaluating the impact of proposed changes on project objectives, timeline, budget, and resources.
Identify the reason for the change in scope
Assess the impact on project objectives, timeline, budget, and resources
Obtain approval from stakeholders for the change
Update project documentation and communicate changes to the team
Monitor and control the implementation of the scope change
Top trending discussions
Some of the top questions asked at the Rithwik Projects interview -
The duration of Rithwik Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 45 interviews
Interview experience
based on 224 reviews
Rating in categories
Hyderabad / Secunderabad
8-13 Yrs
βΉ 6-12 LPA
Assistant Manager
40
salaries
| βΉ5.4 L/yr - βΉ10.8 L/yr |
Office Administrator
23
salaries
| βΉ2.4 L/yr - βΉ3 L/yr |
Tunnel Engineer
21
salaries
| βΉ3 L/yr - βΉ8.4 L/yr |
Civil Engineer
20
salaries
| βΉ2.4 L/yr - βΉ6.8 L/yr |
Surveyor
18
salaries
| βΉ2.2 L/yr - βΉ8.4 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon