I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
It was very good , they give certain time to prepare yourself
It's basically arithmetic and reasoning test
The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.
The nominal size of a brick is typically larger than its actual size to account for mortar joints.
Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.
It is important to consider the nominal size when planning and designing brickwork pr
Admixtures are added to concrete to alter its properties or enhance its performance.
Admixtures can improve workability, durability, strength, and set time of concrete
Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers
Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Yes, I have extensive experience with planning tools like MSP and Primavera for project management and scheduling.
Proficient in Microsoft Project (MSP) for creating Gantt charts and tracking project progress.
Utilized Primavera P6 for managing large-scale construction projects, ensuring resource allocation and timeline adherence.
Experience in integrating MSP with other tools for enhanced reporting and collaboration.
Impl...
The project life cycle outlines the stages a project goes through from initiation to closure.
1. Initiation: Define the project scope and objectives. Example: A project charter is created.
2. Planning: Develop a detailed project plan, including timelines and resources. Example: Gantt charts are often used.
3. Execution: Implement the project plan and monitor progress. Example: Team members complete assigned tasks.
4. Monit...
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
based on 5 interviews
Interview experience
based on 21 reviews
Rating in categories
Assistant Manager
269
salaries
| ₹5.4 L/yr - ₹15 L/yr |
Senior Engineer
236
salaries
| ₹3.8 L/yr - ₹10.5 L/yr |
Civil Engineer
178
salaries
| ₹2.8 L/yr - ₹9.5 L/yr |
Engineer
175
salaries
| ₹2.6 L/yr - ₹8.4 L/yr |
Deputy Manager
161
salaries
| ₹7 L/yr - ₹17.5 L/yr |
L&T Construction
Simplex Infrastructures
AtkinsRealis
Ashoka Buildcon