Upload Button Icon Add office photos

ITD Cementation India

Compare button icon Compare button icon Compare

Filter interviews by

ITD Cementation India Assistant Manager Interview Questions, Process, and Tips

Updated 5 Jan 2025

Top ITD Cementation India Assistant Manager Interview Questions and Answers

View all 8 questions

ITD Cementation India Assistant Manager Interview Experiences

6 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Load test process

Assistant Manager Interview Questions & Answers

user image ratan pathak

posted on 30 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Present company role and responsibilities.
  • Q2. CTC in current employer
  • Ans. 

    I am currently earning a CTC of $60,000 per year in my current employer.

    • My current CTC is $60,000 per year

    • I have been receiving this CTC for the past 2 years

    • I am open to negotiation for a higher CTC in a new role

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Working and maintenance activities regarding DG set and hydel equipment
  • Ans. 

    Maintenance activities for DG set and hydel equipment involve regular inspections, servicing, and repairs to ensure optimal performance and longevity.

    • Regularly inspecting and testing the DG set and hydel equipment for any signs of wear or damage

    • Performing routine servicing such as oil changes, filter replacements, and lubrication

    • Conducting preventive maintenance to avoid unexpected breakdowns

    • Addressing any issues or ma...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with basics, communication skills should be prompt.

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Admin interview 

(3 Questions)

  • Q1. Currently working location
  • Ans. 

    I am currently working at XYZ Company as an Assistant Manager.

    • Currently working at XYZ Company

    • Position: Assistant Manager

  • Answered by AI
  • Q2. Total Experience
  • Q3. What are the projects you handle in your experience?
  • Ans. Residential, Kitchen building, school building,villas projects etc...
  • Answered Anonymously
Round 2 - Technical 

(5 Questions)

  • Q1. 1 ton steel work how much quantity of binding wire required?
  • Ans. 

    The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.

    • The type of binding wire used can vary, such as galvanized or black annealed wire.

    • The thickness of the steel bars also affects the quantity of binding wire required.

    • The binding technique, whether it is single or double binding, will de...

  • Answered by AI
  • Q2. Cost of material and labour for Door frame with the size of 3"*4"*7' ?
  • Ans. 

    The cost of material and labor for a door frame with the size of 3"*4"*7' depends on various factors.

    • The cost of material will depend on the type of wood or material used for the door frame.

    • The cost of labor will depend on the hourly rate of the workers and the time required to complete the installation.

    • Additional costs may include transportation, tools, and any customization or finishing required.

    • To provide an accurat...

  • Answered by AI
  • Q3. What is the pressure of CPVC pipe when testing the water test?
  • Ans. 

    The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.

    • The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).

    • The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.

    • Industry standards, such as ASTM D1785 for CPVC pipes, provide...

  • Answered by AI
  • Q4. Which brand of CP sanitary used in your current project?
  • Ans. 

    The brand of CP sanitary used in my current project is XYZ.

    • The brand XYZ is known for its high-quality and durable CP sanitary products.

    • We chose XYZ brand for its wide range of options and competitive pricing.

    • The CP sanitary products from XYZ have been performing well in our project.

    • We have received positive feedback from the users regarding the XYZ brand.

  • Answered by AI
  • Q5. Kohler CP Sanitary

Interview Preparation Tips

Topics to prepare for ITD Cementation India Assistant Manager interview:
  • Rate Analysis
  • Material Planning
  • Material knowledge
  • Finishing
  • Structural work
Interview preparation tips for other job seekers - I am not preparing for interview.so I can't answer to them properly.So please prepare knowledge of rate analysis of civil structural and finishing work.Material quality checking,rate in market,......Known more about technical knowledge structural and finishing work

Assistant Manager Interview Questions & Answers

user image Raghavendra Chidrawar

posted on 17 May 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding Contracts and claim management
Round 2 - Assignment 

3 cases and its analysis in the claim managent perspective

Round 3 - HR 

(1 Question)

  • Q1. General discussion and future plan

Interview Preparation Tips

Topics to prepare for ITD Cementation India Assistant Manager interview:
  • Honesty
  • good listening
  • good analysing risks

ITD Cementation India interview questions for designations

 Assistant General Manager

 (1)

 Assistant Officer

 (1)

 Office Assistant

 (1)

 Manager

 (2)

 Assistant Engineer

 (1)

 Team Manager

 (1)

 Deputy Manager

 (1)

 Senior Deputy General Manager

 (1)

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the stagnant hight of DG
  • Ans. 

    The stagnant height of DG refers to the maximum height at which a diesel generator can operate without overheating or malfunctioning.

    • Stagnant height of DG is determined by factors such as cooling system efficiency, ambient temperature, and load capacity.

    • For example, a diesel generator may have a stagnant height of 1000 meters, meaning it can operate effectively up to that altitude.

    • Regular maintenance and monitoring of ...

  • Answered by AI

Get interview-ready with Top ITD Cementation India Interview Questions

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Self introduction & present working environment
  • Q2. Why looking for a change
  • Q3. Suitable for any place in India
Round 3 - Technical 

(1 Question)

  • Q1. Based on CV mentioned experience work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident during self introduction.
Please mention what you had done in your career but do not included those things that not done by you

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Rate analysis for building Items
  • Ans. 

    Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.

    • Rate analysis helps in determining the cost of each building item based on material and labor costs.

    • It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.

    • Rate analysis helps in estimating the total project cost accurately.

    • For ex...

  • Answered by AI
  • Q2. Material Rates of building materials
  • Ans. 

    Material rates of building materials vary based on factors like location, quality, and demand.

    • Material rates can vary based on the location of the construction site.

    • The quality of the building materials can also impact the rates.

    • Demand for certain materials can cause fluctuations in prices.

    • For example, the rate of cement in urban areas may be higher compared to rural areas.

    • Higher quality bricks may cost more than lower...

  • Answered by AI

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is my strength?
  • Ans. 

    My strength is my ability to lead and motivate a team towards achieving goals.

    • Effective communication skills

    • Strong decision-making abilities

    • Ability to delegate tasks efficiently

    • Positive attitude towards challenges

    • Experience in managing teams

    • Motivational skills

    • Goal-oriented mindset

  • Answered by AI
  • Q2. What is my weakness?

Interview Preparation Tips

Topics to prepare for Ramky Infrastructure Assistant Manager interview:
  • Technicals
Interview preparation tips for other job seekers - Give interview confidently and they do a much of bargaining in salary. So stay in your demand.

ITD Cementation India Interview FAQs

How many rounds are there in ITD Cementation India Assistant Manager interview?
ITD Cementation India interview process usually has 2 rounds. The most common rounds in the ITD Cementation India interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in ITD Cementation India Assistant Manager interview?

Some of the top questions asked at the ITD Cementation India Assistant Manager interview -

  1. 1 ton steel work how much quantity of binding wire requir...read more
  2. What is the pressure of CPVC pipe when testing the water te...read more
  3. Which brand of CP sanitary used in your current proje...read more

Tell us how to improve this page.

ITD Cementation India Assistant Manager Interview Process

based on 8 interviews

1 Interview rounds

  • Technical Round
View more
ITD Cementation India Assistant Manager Salary
based on 275 salaries
₹5.5 L/yr - ₹15 L/yr
29% more than the average Assistant Manager Salary in India
View more details

ITD Cementation India Assistant Manager Reviews and Ratings

based on 53 reviews

4.1/5

Rating in categories

3.5

Skill development

3.9

Work-life balance

3.9

Salary

4.3

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 53 Reviews and Ratings
Assistant Manager
275 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
236 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
183 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
168 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
166 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare ITD Cementation India with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview