Upload Button Icon Add office photos

ITD Cementation India

Compare button icon Compare button icon Compare

Filter interviews by

ITD Cementation India Interview Questions, Process, and Tips

Updated 15 Feb 2025

Top ITD Cementation India Interview Questions and Answers

View all 52 questions

ITD Cementation India Interview Experiences

Popular Designations

67 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Admin interview 

(3 Questions)

  • Q1. Currently working location
  • Ans. 

    I am currently working at XYZ Company as an Assistant Manager.

    • Currently working at XYZ Company

    • Position: Assistant Manager

  • Answered by AI
  • Q2. Total Experience
  • Q3. What are the projects you handle in your experience?
  • Ans. Residential, Kitchen building, school building,villas projects etc...
  • Answered Anonymously
Round 2 - Technical 

(5 Questions)

  • Q1. 1 ton steel work how much quantity of binding wire required?
  • Ans. 

    The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.

    • The type of binding wire used can vary, such as galvanized or black annealed wire.

    • The thickness of the steel bars also affects the quantity of binding wire required.

    • The binding technique, whether it is single or double binding, will de...

  • Answered by AI
  • Q2. Cost of material and labour for Door frame with the size of 3"*4"*7' ?
  • Ans. 

    The cost of material and labor for a door frame with the size of 3"*4"*7' depends on various factors.

    • The cost of material will depend on the type of wood or material used for the door frame.

    • The cost of labor will depend on the hourly rate of the workers and the time required to complete the installation.

    • Additional costs may include transportation, tools, and any customization or finishing required.

    • To provide an accurat...

  • Answered by AI
  • Q3. What is the pressure of CPVC pipe when testing the water test?
  • Ans. 

    The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.

    • The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).

    • The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.

    • Industry standards, such as ASTM D1785 for CPVC pipes, provide...

  • Answered by AI
  • Q4. Which brand of CP sanitary used in your current project?
  • Ans. 

    The brand of CP sanitary used in my current project is XYZ.

    • The brand XYZ is known for its high-quality and durable CP sanitary products.

    • We chose XYZ brand for its wide range of options and competitive pricing.

    • The CP sanitary products from XYZ have been performing well in our project.

    • We have received positive feedback from the users regarding the XYZ brand.

  • Answered by AI
  • Q5. Kohler CP Sanitary

Interview Preparation Tips

Topics to prepare for ITD Cementation India Assistant Manager interview:
  • Rate Analysis
  • Material Planning
  • Material knowledge
  • Finishing
  • Structural work
Interview preparation tips for other job seekers - I am not preparing for interview.so I can't answer to them properly.So please prepare knowledge of rate analysis of civil structural and finishing work.Material quality checking,rate in market,......Known more about technical knowledge structural and finishing work

Top ITD Cementation India Assistant Manager Interview Questions and Answers

Q1. 1 ton steel work how much quantity of binding wire required?
View answer (4)

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Store Keeper Interview Questions & Answers

user image Babula Goudo

posted on 17 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Work Experience
  • Q2. How to manage store and out side material staging
  • Ans. 

    To manage store and outside material staging, organize inventory, maintain clear labeling, implement FIFO system, and regularly inspect and update stock levels.

    • Organize inventory in a systematic manner to easily locate items

    • Maintain clear labeling on shelves, bins, and containers for quick identification

    • Implement FIFO (First In, First Out) system to ensure older stock is used first

    • Regularly inspect and update stock lev

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Material receive and issue
  • Q2. Quality related like TMT Bar and Bulk material
Round 3 - One-on-one 

(2 Questions)

  • Q1. Spares related issues
  • Q2. ERP SAP work Experience
  • Ans. 

    I have 3 years of experience working with ERP SAP in inventory management and data entry.

    • Managed inventory levels using SAP system

    • Entered data accurately and efficiently into SAP database

    • Generated reports on inventory status and trends

    • Collaborated with other departments to ensure accurate inventory records

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks

Skills evaluated in this interview

Store Keeper Interview Questions asked at other Companies

Q1. What is the process of material receiving??
View answer (4)

Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Sep 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. About pile method
  • Q2. About pile cap, pier and pier cap
  • Q3. About deck slab
  • Q4. About shuttering work
  • Q5. About professional work like bbs, billing

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (7)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Simple 1year question for fresher dipend upon designation and strim
  • Q2. Privious work experience
  • Ans. 

    I have 5 years of experience working as an Operation & Maintenance Engineer in a manufacturing plant.

    • Managed daily operations and maintenance activities to ensure smooth functioning of equipment and machinery

    • Implemented preventive maintenance schedules to minimize downtime and increase efficiency

    • Troubleshooted and resolved technical issues to maintain production targets

    • Collaborated with cross-functional teams to improv...

  • Answered by AI
  • Q3. You must know all about your privious work
  • Q4. If you are mechanical learn all about engine and hydraulic

Operation & Maintenance Engineer Interview Questions asked at other Companies

Q1. Why we do oil test and what are we check in oil test?
View answer (1)

ITD Cementation India interview questions for popular designations

 Assistant Manager

 (6)

 Senior Engineer

 (4)

 Engineer

 (2)

 Manager

 (2)

 Diploma Trainee Engineer

 (2)

 Electrical Engineer

 (2)

 Senior Civil Engineer

 (2)

 Civil Engineer

 (2)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related. Work responsibilities, methods, profile, problems, solutions.
  • Q2. Experience related
Round 2 - Technical 

(2 Questions)

  • Q1. Work related questions. Responsibility, experience, methods, problems, solutions.
  • Q2. Commercial , salary related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Purely work & experience & job requirements related questions.

Assistant General Manager Interview Questions asked at other Companies

Q1. It is observed that most of our Indian Bank's NIM is declining over the years. what could be some alternate revenue model for banks for boosting overall income to compensate for the declining NIM?
View answer (2)

Get interview-ready with Top ITD Cementation India Interview Questions

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel structures
  • Q2. Shuttering work
  • Q3. Steel structures bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - # Work experience #
∞ . Conventional shuttering, ∞. Aluform shuttering. system formwork,
∞. Reinforcement checking and BBS
∞. Site execution as per drowning.

★. 3rd year experience and at Alcove Developers LLP , high-rise, residential building project, new kalkata project - 22 nos tower (G+30) with non - tower, club house, road , stp , RWHT , from 15 th December, 2020 currently working in this role ( G+2 podium+ 28 typical floor) tower in charge.

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Jobs at ITD Cementation India

View all

Safety Engineer Interview Questions & Answers

user image NITINBHAI BHAGORA

posted on 9 Aug 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Scaffolding erection and dismantling
  • Q2. Crane and lifting tools and tackles

Safety Engineer Interview Questions asked at other Companies

Q1. What is the safe distance of excavations from a a truck
View answer (6)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. What is Safety Management System
  • Ans. 

    Safety Management System is a systematic approach to managing safety, including policies, procedures, and processes.

    • SMS involves identifying hazards, assessing risks, and implementing controls to mitigate risks.

    • It includes setting safety goals, monitoring performance, and continuously improving safety practices.

    • SMS helps organizations comply with regulations, reduce incidents, and create a safer work environment.

    • Exampl...

  • Answered by AI
  • Q2. What is Hazard, Risk and Control Measure
  • Ans. 

    Hazard is a potential source of harm, risk is the likelihood of harm occurring, and control measures are actions taken to reduce or eliminate the risk.

    • Hazard: Any potential source of harm or adverse health effect.

    • Risk: The likelihood of harm occurring from exposure to a hazard.

    • Control Measure: Actions taken to reduce or eliminate the risk associated with a hazard.

    • Example: Hazard - Chemical exposure, Risk - Inhalation o...

  • Answered by AI
  • Q3. What is Fault Tree Analysis
  • Ans. 

    Fault Tree Analysis is a systematic, deductive method used to identify the root causes of a system failure.

    • It starts with identifying the top event, which is the system failure.

    • Then, it breaks down the top event into intermediate events and basic events using logic gates.

    • Basic events are the lowest level events that directly contribute to the top event.

    • By analyzing the relationships between events, potential causes of ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Knowledgeable and Smart

Sr. EHS Engineer Interview Questions asked at other Companies

Q1. What is Hazard, Risk and Control Measure
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Load test process

Top ITD Cementation India Assistant Manager Interview Questions and Answers

Q1. 1 ton steel work how much quantity of binding wire required?
View answer (4)

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Loadcell damage, How can you rectify
  • Ans. 

    Loadcell damage can be rectified by recalibrating or replacing the loadcell.

    • Recalibrate the loadcell using the manufacturer's instructions.

    • Replace the damaged loadcell with a new one.

    • Ensure proper maintenance and regular checks to prevent future damage.

  • Answered by AI

Concrete Batching Plant Operator Interview Questions asked at other Companies

Q1. How many types of plant are there?
View answer (1)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2024.

Round 1 - Lab technician 

(2 Questions)

  • Q1. How many days notice period
  • Q2. Quality Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality control

Lab Technician Interview Questions asked at other Companies

Q1. Order of draw Cbc parameters and normal range
View answer (39)

ITD Cementation India Interview FAQs

How many rounds are there in ITD Cementation India interview?
ITD Cementation India interview process usually has 2-3 rounds. The most common rounds in the ITD Cementation India interview process are Technical, HR and Resume Shortlist.
How to prepare for ITD Cementation India interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ITD Cementation India. The most common topics and skills that interviewers at ITD Cementation India expect are Procurement, Vendor Development, MEP, SCM and Vendor Management.
What are the top questions asked in ITD Cementation India interview?

Some of the top questions asked at the ITD Cementation India interview -

  1. 1 ton steel work how much quantity of binding wire requir...read more
  2. What is the pressure of CPVC pipe when testing the water te...read more
  3. Which brand of CP sanitary used in your current proje...read more
How long is the ITD Cementation India interview process?

The duration of ITD Cementation India interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

ITD Cementation India Interview Process

based on 94 interviews

Interview experience

4.4
  
Good
View more

ITD Cementation India Reviews and Ratings

based on 1.2k reviews

4.3/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

4.0

Salary

4.3

Job security

4.0

Company culture

3.6

Promotions

3.9

Work satisfaction

Explore 1.2k Reviews and Ratings
Accountant

Mumbai

2-4 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
275 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
236 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
183 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
168 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
166 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare ITD Cementation India with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview