Upload Button Icon Add office photos

ITD Cementation India

Compare button icon Compare button icon Compare

Filter interviews by

ITD Cementation India Operation & Maintenance Engineer Interview Questions and Answers

Updated 21 Aug 2024

ITD Cementation India Operation & Maintenance Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Simple 1year question for fresher dipend upon designation and strim
  • Q2. Privious work experience
  • Ans. 

    I have 5 years of experience working as an Operation & Maintenance Engineer in a manufacturing plant.

    • Managed daily operations and maintenance activities to ensure smooth functioning of equipment and machinery

    • Implemented preventive maintenance schedules to minimize downtime and increase efficiency

    • Troubleshooted and resolved technical issues to maintain production targets

    • Collaborated with cross-functional teams to improv...

  • Answered by AI
  • Q3. You must know all about your privious work
  • Q4. If you are mechanical learn all about engine and hydraulic

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to start a new project ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just say what are you doing in the past and what you can do.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

1 Question

  • Q1. Technical question
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About Highway Work related and Earthwork related
  • Q2. About Flexible pavement

Interview Preparation Tips

Interview preparation tips for other job seekers - HGIEL is very up growthing company for highway work
Good team work
Cooperative staff and HR team
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pile related and stressing related and what type of work is working on
  • Q2. Density of bentonite Prestressing formula
  • Ans. 

    Density of bentonite and prestressing formula are two separate topics in civil engineering.

    • Density of bentonite is typically around 2.0-2.5 g/cm^3.

    • Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.

    • Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep interview frelly and discussion

ITD Cementation India Interview FAQs

How many rounds are there in ITD Cementation India Operation & Maintenance Engineer interview?
ITD Cementation India interview process usually has 1 rounds. The most common rounds in the ITD Cementation India interview process are Technical.
What are the top questions asked in ITD Cementation India Operation & Maintenance Engineer interview?

Some of the top questions asked at the ITD Cementation India Operation & Maintenance Engineer interview -

  1. If you are mechanical learn all about engine and hydrau...read more
  2. simple 1year question for fresher dipend upon designation and st...read more

Tell us how to improve this page.

ITD Cementation India Operation & Maintenance Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Assistant Manager
292 salaries
unlock blur

₹5.4 L/yr - ₹15 L/yr

Senior Engineer
230 salaries
unlock blur

₹3.8 L/yr - ₹11 L/yr

Civil Engineer
178 salaries
unlock blur

₹2.8 L/yr - ₹9.5 L/yr

Engineer
176 salaries
unlock blur

₹2.9 L/yr - ₹8 L/yr

Deputy Manager
160 salaries
unlock blur

₹7 L/yr - ₹17.5 L/yr

Explore more salaries
Compare ITD Cementation India with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AtkinsRealis

3.9
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview