I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Question had been asked from civil engineering syllabus
Top trending discussions
posted on 11 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Anchorage of reinforcing bars refers to the method of securing the bars in concrete to ensure proper transfer of forces.
Anchorage length is the portion of the reinforcing bar embedded in concrete to transfer forces effectively.
Proper anchorage is crucial for the structural integrity of the concrete element.
Anchorage can be achieved through hooks, bends, or mechanical anchorage devices.
Development length is the minimum ...
The minimum development length in a column is the length required for the full transfer of stress from the steel reinforcement to the concrete.
The minimum development length is typically specified by design codes or standards.
It is influenced by factors such as the diameter of the reinforcement, concrete strength, and bond characteristics.
For example, in ACI 318, the minimum development length for a #5 bar is 12 inches...
Embedded length is the length of reinforcement bar embedded in concrete, while development length is the length required for the bar to transfer its load to the concrete.
Embedded length is the portion of the reinforcement bar that is embedded in concrete to provide structural support.
Development length is the length of reinforcement required for the bar to transfer its load to the concrete without slippage.
Embedded len...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 27 Nov 2023
The process of a Water Treatment Plant (WTP) involves several stages to purify water for safe consumption.
Coagulation and Flocculation: Chemicals are added to water to remove suspended particles.
Sedimentation: The water is allowed to settle, and the solids are removed.
Filtration: Water passes through various filters to remove smaller particles.
Disinfection: Chlorine or other disinfectants are added to kill harmful micr...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo
I am available to join immediately.
I can start working as soon as possible.
I am flexible with the joining date.
I am ready to begin work immediately.
I can join within a week of receiving the offer.
I am excited to start working on the specified joining date.
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer about my intention to leave and they are aware of my notice period.
I applied via Walk-in
About your job, location, CTC
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
based on 4 interviews
Interview experience
based on 46 reviews
Rating in categories
Assistant Manager
275
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
183
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
168
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Hindustan Construction Company
Simplex Infrastructures