Updated 4 Dec 2023

Top ITD Cementation India Manager Mech Interview Questions and Answers

ITD Cementation India Manager Mech Interview Experiences

2 interviews found

Manager Mech Interview Questions & Answers

user image Sreenivas A

posted on 4 Dec 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary & details about your work
Round 3 - Technical 

(1 Question)

  • Q1. About fire sprinklers About PRV About HVAC system
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Bengali language people are given more preference.If you are Bengal/Bihar/ Odisha then you may joyfully apply. Others please find other company.

Manager Mech Interview Questions & Answers

user image Anonymous

posted on 16 Dec 2022

I applied via Company Website and was interviewed in Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Suppose field change happened what will you like industrial instead of commercial

How will you respond false information fed to other people by one of your colleagues

How vendor classifications will you do.

Round 3 - Technical 

(5 Questions)

  • Q1. What's ACB and how does it trip
  • Ans. 

    ACB stands for Air Circuit Breaker. It trips when the current flowing through it exceeds its rated capacity.

    • ACB is a type of circuit breaker that is used to protect electrical circuits from overloads, short circuits, and other faults.

    • It works by interrupting the flow of current when it exceeds the rated capacity of the breaker.

    • ACBs are commonly used in industrial and commercial settings, where large amounts of power ar...

  • Answered by AI
  • Q2. What's explosive vent for air cooled transformer
  • Ans. 

    An explosive vent is a safety device installed on air-cooled transformers to prevent explosions.

    • It is designed to release pressure buildup inside the transformer in case of a fault or malfunction.

    • The vent is typically made of a thin metal membrane that ruptures when pressure exceeds a certain level.

    • This allows the hot gases and oil to escape, preventing the transformer from exploding.

    • Explosive vents are required by ind...

  • Answered by AI
  • Q3. How much coverage does sprinkler have
  • Ans. 

    The coverage of sprinklers depends on the type of sprinkler system installed and the size of the area to be covered.

    • Sprinkler coverage can range from a few feet to over 100 feet depending on the system.

    • The size and shape of the area to be covered also affects the sprinkler coverage.

    • Different types of sprinklers have different coverage patterns, such as circular, rectangular, or square.

    • Sprinkler coverage can also be aff...

  • Answered by AI
  • Q4. What is PRV and what are different types
  • Ans. 

    PRV stands for Pressure Relief Valve. It is a safety device used to protect equipment and systems from overpressure.

    • PRVs are used in various industries such as oil and gas, chemical, and power generation.

    • There are different types of PRVs such as spring-loaded, pilot-operated, and bellows.

    • Spring-loaded PRVs are the most common type and operate by using a spring to keep the valve closed until the pressure exceeds a set l...

  • Answered by AI
  • Q5. Different make of breakers
  • Ans. 

    There are various makes of breakers available in the market.

    • Different makes of breakers have different features and specifications.

    • Some popular brands include Siemens, Schneider Electric, ABB, and Eaton.

    • The choice of breaker depends on the application and the specific requirements.

    • It is important to select the right breaker to ensure safety and reliability of the electrical system.

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Salary and in hand money
  • Q2. Notice period for current company

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be ready to relocate anywhere in India.

Manager Mech Interview Questions Asked at Other Companies

Q1. What's explosive vent for air cooled transformer
Q2. What's ACB and how does it trip
Q3. How much coverage does sprinkler have
Q4. What is PRV and what are different types
Q5. types of lubrication for rotating mechanism

Interview questions from similar companies

I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Baching plant Rmu Tamrock Shotcrete machine Grouting pumps Layout of project Crusher plant
  • Q2. Why you want to join Why you want to leave Why we hire you
  • Ans. 

    I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.

    • Seeking new challenges and opportunities for skill development

    • Leaving for career growth and advancement

    • Experience and expertise in the field

    • Ability to contribute effectively to the team and projects

  • Answered by AI

Interview Preparation Tips

General Tips: Be positive
Be prepared
Be calm
Don't be stressed


Skills: Communication, Problem Solving, Leadership, Time Management
Duration: <1 week

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

ITD Cementation India Interview FAQs

How many rounds are there in ITD Cementation India Manager Mech interview?
ITD Cementation India interview process usually has 4 rounds. The most common rounds in the ITD Cementation India interview process are HR, Resume Shortlist and Technical.
What are the top questions asked in ITD Cementation India Manager Mech interview?

Some of the top questions asked at the ITD Cementation India Manager Mech interview -

  1. What's explosive vent for air cooled transfor...read more
  2. What's ACB and how does it t...read more
  3. How much coverage does sprinkler h...read more

Tell us how to improve this page.

ITD Cementation India Manager Mech Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
ITD Cementation India Manager Mech Salary
based on 4 salaries
₹12 L/yr - ₹17 L/yr
5% less than the average Manager Mech Salary in India
View more details
Assistant Manager
275 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
236 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
183 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
168 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
166 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare ITD Cementation India with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview