Add office photos
ITD Cementation India logo
Employer?
Claim Account for FREE

ITD Cementation India

4.3
based on 1.2k Reviews
Video summary
Filter interviews by
Assistant Manager
Clear (1)

ITD Cementation India Assistant Manager Interview Questions and Answers

Updated 27 May 2024

Q1. 1 ton steel work how much quantity of binding wire required?

Ans.

The quantity of binding wire required for 1 ton of steel work depends on various factors such as the type of binding wire used, the thickness of the steel bars, and the binding technique.

  • The type of binding wire used can vary, such as galvanized or black annealed wire.

  • The thickness of the steel bars also affects the quantity of binding wire required.

  • The binding technique, whether it is single or double binding, will determine the amount of wire needed.

  • To determine the exact q...read more

View 3 more answers
right arrow

Q2. What is the pressure of CPVC pipe when testing the water test?

Ans.

The pressure of CPVC pipe during water testing varies depending on the specific application and industry standards.

  • The pressure of CPVC pipe during water testing is typically measured in pounds per square inch (psi).

  • The specific pressure requirements may vary based on the intended use of the CPVC pipe, such as residential plumbing or industrial applications.

  • Industry standards, such as ASTM D1785 for CPVC pipes, provide guidelines for the pressure ratings of CPVC pipes.

  • For exa...read more

View 2 more answers
right arrow

Q3. Which brand of CP sanitary used in your current project?

Ans.

The brand of CP sanitary used in my current project is XYZ.

  • The brand XYZ is known for its high-quality and durable CP sanitary products.

  • We chose XYZ brand for its wide range of options and competitive pricing.

  • The CP sanitary products from XYZ have been performing well in our project.

  • We have received positive feedback from the users regarding the XYZ brand.

View 1 answer
right arrow

Q4. Cost of material and labour for Door frame with the size of 3"*4"*7' ?

Ans.

The cost of material and labor for a door frame with the size of 3"*4"*7' depends on various factors.

  • The cost of material will depend on the type of wood or material used for the door frame.

  • The cost of labor will depend on the hourly rate of the workers and the time required to complete the installation.

  • Additional costs may include transportation, tools, and any customization or finishing required.

  • To provide an accurate cost estimate, specific prices for materials and labor r...read more

View 2 more answers
right arrow
Discover ITD Cementation India interview dos and don'ts from real experiences

Q5. Working and maintenance activities regarding DG set and hydel equipment

Ans.

Maintenance activities for DG set and hydel equipment involve regular inspections, servicing, and repairs to ensure optimal performance and longevity.

  • Regularly inspecting and testing the DG set and hydel equipment for any signs of wear or damage

  • Performing routine servicing such as oil changes, filter replacements, and lubrication

  • Conducting preventive maintenance to avoid unexpected breakdowns

  • Addressing any issues or malfunctions promptly to prevent further damage

  • Keeping detai...read more

Add your answer
right arrow

Q6. Currently working location

Ans.

I am currently working at XYZ Company as an Assistant Manager.

  • Currently working at XYZ Company

  • Position: Assistant Manager

View 1 answer
right arrow

Q7. What is the stagnant hight of DG

Ans.

The stagnant height of DG refers to the maximum height at which a diesel generator can operate without overheating or malfunctioning.

  • Stagnant height of DG is determined by factors such as cooling system efficiency, ambient temperature, and load capacity.

  • For example, a diesel generator may have a stagnant height of 1000 meters, meaning it can operate effectively up to that altitude.

  • Regular maintenance and monitoring of the cooling system are essential to ensure the DG operates...read more

Add your answer
right arrow

Q8. CTC in current employer

Ans.

I am currently earning a CTC of $60,000 per year in my current employer.

  • My current CTC is $60,000 per year

  • I have been receiving this CTC for the past 2 years

  • I am open to negotiation for a higher CTC in a new role

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at ITD Cementation India Assistant Manager

based on 8 interviews
1 Interview rounds
Technical Round
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Assistant Manager Interview Questions from Similar Companies

Deloitte Logo
3.8
 • 41 Interview Questions
JK Cement Logo
4.1
 • 12 Interview Questions
Havells Logo
4.0
 • 12 Interview Questions
View all
Recently Viewed
CAMPUS PLACEMENT
SRM university (SRMU)
CAMPUS PLACEMENT
Jadavpur University
INTERVIEWS
Bosch Chassis Systems
No Interviews
CAMPUS PLACEMENT
KIIT University, Bhuvaneshwar
INTERVIEWS
ITD Cementation India
No Interviews
INTERVIEWS
ITD Cementation India
No Interviews
INTERVIEWS
Scanpoint Geomatics
No Interviews
INTERVIEWS
RIPPL Lighting
No Interviews
INTERVIEWS
Trivayu Media Works
No Interviews
INTERVIEWS
Jacobs Engineering Group
No Interviews
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter