I applied via Campus Placement and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is the mix design?
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce a concrete mix with desired properties.

    • Mix design is crucial for achieving the desired strength, workability, and durability of concrete.

    • It involves selecting the appropriate materials and determining their proportions based on the desired properties of the concrete.

    • Factors such as the type of cement, aggreg...

  • Answered by AI
  • Q2. What's opc prefer for mix design
  • Ans. 

    OPC 43 grade cement is commonly preferred for mix design in construction sites.

    • OPC 43 grade cement has a higher compressive strength compared to OPC 33 grade cement.

    • It is suitable for construction of buildings, bridges, and other structures.

    • OPC 43 grade cement is cost-effective and easily available in the market.

    • It is important to consider the specific requirements of the project before finalizing the mix design.

  • Answered by AI
  • Q3. What do you mean by quality control
  • Ans. 

    Quality control refers to the process of ensuring that products or services meet the desired level of quality.

    • Quality control involves inspecting and testing products or services to ensure they meet the required standards.

    • It also involves identifying and correcting any defects or issues that may arise during the production process.

    • Quality control is important in construction to ensure that buildings and structures are ...

  • Answered by AI
  • Q4. What is Is code for opc 33/43/53
  • Ans. 

    IS code for OPC 33/43/53 is IS 269:2015

    • IS 269:2015 is the Indian Standard code for OPC 33/43/53

    • This code specifies the requirements and methods of sampling and testing for ordinary Portland cement

    • OPC 33/43/53 refers to the compressive strength of the cement in megapascals (MPa)

    • OPC 33 has a compressive strength of 33 MPa, OPC 43 has a compressive strength of 43 MPa, and OPC 53 has a compressive strength of 53 MPa

  • Answered by AI
  • Q5. What is the slum rate for column concrete
  • Ans. 

    The slum rate for column concrete is not a standard term in construction. Please provide more context.

    • Slump test is used to measure the consistency of concrete.

    • The slump test measures the vertical settlement of the concrete after the slump cone is removed.

    • The slump test is not used to determine the rate of concrete for columns.

    • The rate of concrete for columns depends on the design specifications and the construction sc

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was outstanding experience and discussion without any tension.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. 1ft = how inch
  • Ans. 

    1ft is equal to 12 inches.

    • 1 foot is equivalent to 12 inches.

    • The conversion factor from feet to inches is 12.

    • To convert feet to inches, multiply the number of feet by 12.

    • For example, 5 feet is equal to 60 inches (5 x 12 = 60).

  • Answered by AI

I applied via Company Website and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Latest developments in construction technology
  • Ans. 

    Construction technology is rapidly evolving, with new developments in materials, equipment, and software.

    • 3D printing is being used to create complex building components quickly and efficiently.

    • Drones are being used for site surveys, inspections, and progress monitoring.

    • Building Information Modeling (BIM) software is being used to create detailed digital models of buildings and construction sites.

    • Augmented Reality (AR) ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be up to date in your profession

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

ITD Cementation India Interview FAQs

What are the top questions asked in ITD Cementation India Construction Site Supervisor, Construction Site Engineer interview?

Some of the top questions asked at the ITD Cementation India Construction Site Supervisor, Construction Site Engineer interview -

  1. What is the slum rate for column concre...read more
  2. What's opc prefer for mix desi...read more
  3. What do you mean by quality contro...read more

Tell us how to improve this page.

Assistant Manager
269 salaries
unlock blur

₹5.4 L/yr - ₹15 L/yr

Senior Engineer
230 salaries
unlock blur

₹3.8 L/yr - ₹11 L/yr

Civil Engineer
178 salaries
unlock blur

₹2.8 L/yr - ₹9.5 L/yr

Engineer
176 salaries
unlock blur

₹2.9 L/yr - ₹8 L/yr

Deputy Manager
168 salaries
unlock blur

₹8.2 L/yr - ₹17.5 L/yr

Explore more salaries
Compare ITD Cementation India with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AtkinsRealis

3.9
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview