Filter interviews by
posted on 12 Sep 2020
I applied via Campus Placement and was interviewed in Mar 2020. There were 3 interview rounds.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce a concrete mix with desired properties.
Mix design is crucial for achieving the desired strength, workability, and durability of concrete.
It involves selecting the appropriate materials and determining their proportions based on the desired properties of the concrete.
Factors such as the type of cement, aggreg...
OPC 43 grade cement is commonly preferred for mix design in construction sites.
OPC 43 grade cement has a higher compressive strength compared to OPC 33 grade cement.
It is suitable for construction of buildings, bridges, and other structures.
OPC 43 grade cement is cost-effective and easily available in the market.
It is important to consider the specific requirements of the project before finalizing the mix design.
Quality control refers to the process of ensuring that products or services meet the desired level of quality.
Quality control involves inspecting and testing products or services to ensure they meet the required standards.
It also involves identifying and correcting any defects or issues that may arise during the production process.
Quality control is important in construction to ensure that buildings and structures are ...
IS code for OPC 33/43/53 is IS 269:2015
IS 269:2015 is the Indian Standard code for OPC 33/43/53
This code specifies the requirements and methods of sampling and testing for ordinary Portland cement
OPC 33/43/53 refers to the compressive strength of the cement in megapascals (MPa)
OPC 33 has a compressive strength of 33 MPa, OPC 43 has a compressive strength of 43 MPa, and OPC 53 has a compressive strength of 53 MPa
The slum rate for column concrete is not a standard term in construction. Please provide more context.
Slump test is used to measure the consistency of concrete.
The slump test measures the vertical settlement of the concrete after the slump cone is removed.
The slump test is not used to determine the rate of concrete for columns.
The rate of concrete for columns depends on the design specifications and the construction sc
To manage store and outside material staging, organize inventory, maintain clear labeling, implement FIFO system, and regularly inspect and update stock levels.
Organize inventory in a systematic manner to easily locate items
Maintain clear labeling on shelves, bins, and containers for quick identification
Implement FIFO (First In, First Out) system to ensure older stock is used first
Regularly inspect and update stock lev
I have 3 years of experience working with ERP SAP in inventory management and data entry.
Managed inventory levels using SAP system
Entered data accurately and efficiently into SAP database
Generated reports on inventory status and trends
Collaborated with other departments to ensure accurate inventory records
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
posted on 21 Aug 2024
I have 5 years of experience working as an Operation & Maintenance Engineer in a manufacturing plant.
Managed daily operations and maintenance activities to ensure smooth functioning of equipment and machinery
Implemented preventive maintenance schedules to minimize downtime and increase efficiency
Troubleshooted and resolved technical issues to maintain production targets
Collaborated with cross-functional teams to improv...
ITD Cementation India interview questions for popular designations
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Get interview-ready with Top ITD Cementation India Interview Questions
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
Safety Management System is a systematic approach to managing safety, including policies, procedures, and processes.
SMS involves identifying hazards, assessing risks, and implementing controls to mitigate risks.
It includes setting safety goals, monitoring performance, and continuously improving safety practices.
SMS helps organizations comply with regulations, reduce incidents, and create a safer work environment.
Exampl...
Hazard is a potential source of harm, risk is the likelihood of harm occurring, and control measures are actions taken to reduce or eliminate the risk.
Hazard: Any potential source of harm or adverse health effect.
Risk: The likelihood of harm occurring from exposure to a hazard.
Control Measure: Actions taken to reduce or eliminate the risk associated with a hazard.
Example: Hazard - Chemical exposure, Risk - Inhalation o...
Fault Tree Analysis is a systematic, deductive method used to identify the root causes of a system failure.
It starts with identifying the top event, which is the system failure.
Then, it breaks down the top event into intermediate events and basic events using logic gates.
Basic events are the lowest level events that directly contribute to the top event.
By analyzing the relationships between events, potential causes of ...
posted on 13 Feb 2025
Loadcell damage can be rectified by recalibrating or replacing the loadcell.
Recalibrate the loadcell using the manufacturer's instructions.
Replace the damaged loadcell with a new one.
Ensure proper maintenance and regular checks to prevent future damage.
I was interviewed in Oct 2024.
The duration of ITD Cementation India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 94 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Assistant Manager
275
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
183
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
168
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Hindustan Construction Company
Simplex Infrastructures