Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Construction Site Supervisor, Construction Site Engineer Interview Questions and Answers

Updated 25 Jan 2021

L&T Construction Construction Site Supervisor, Construction Site Engineer Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. 1ft = how inch
  • Ans. 

    1ft is equal to 12 inches.

    • 1 foot is equivalent to 12 inches.

    • The conversion factor from feet to inches is 12.

    • To convert feet to inches, multiply the number of feet by 12.

    • For example, 5 feet is equal to 60 inches (5 x 12 = 60).

  • Answered by AI

Interview questions from similar companies

I applied via Campus Placement and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is the mix design?
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce a concrete mix with desired properties.

    • Mix design is crucial for achieving the desired strength, workability, and durability of concrete.

    • It involves selecting the appropriate materials and determining their proportions based on the desired properties of the concrete.

    • Factors such as the type of cement, aggreg...

  • Answered by AI
  • Q2. What's opc prefer for mix design
  • Ans. 

    OPC 43 grade cement is commonly preferred for mix design in construction sites.

    • OPC 43 grade cement has a higher compressive strength compared to OPC 33 grade cement.

    • It is suitable for construction of buildings, bridges, and other structures.

    • OPC 43 grade cement is cost-effective and easily available in the market.

    • It is important to consider the specific requirements of the project before finalizing the mix design.

  • Answered by AI
  • Q3. What do you mean by quality control
  • Ans. 

    Quality control refers to the process of ensuring that products or services meet the desired level of quality.

    • Quality control involves inspecting and testing products or services to ensure they meet the required standards.

    • It also involves identifying and correcting any defects or issues that may arise during the production process.

    • Quality control is important in construction to ensure that buildings and structures are ...

  • Answered by AI
  • Q4. What is Is code for opc 33/43/53
  • Ans. 

    IS code for OPC 33/43/53 is IS 269:2015

    • IS 269:2015 is the Indian Standard code for OPC 33/43/53

    • This code specifies the requirements and methods of sampling and testing for ordinary Portland cement

    • OPC 33/43/53 refers to the compressive strength of the cement in megapascals (MPa)

    • OPC 33 has a compressive strength of 33 MPa, OPC 43 has a compressive strength of 43 MPa, and OPC 53 has a compressive strength of 53 MPa

  • Answered by AI
  • Q5. What is the slum rate for column concrete
  • Ans. 

    The slum rate for column concrete is not a standard term in construction. Please provide more context.

    • Slump test is used to measure the consistency of concrete.

    • The slump test measures the vertical settlement of the concrete after the slump cone is removed.

    • The slump test is not used to determine the rate of concrete for columns.

    • The rate of concrete for columns depends on the design specifications and the construction sc

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was outstanding experience and discussion without any tension.

I applied via Company Website and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Latest developments in construction technology
  • Ans. 

    Construction technology is rapidly evolving, with new developments in materials, equipment, and software.

    • 3D printing is being used to create complex building components quickly and efficiently.

    • Drones are being used for site surveys, inspections, and progress monitoring.

    • Building Information Modeling (BIM) software is being used to create detailed digital models of buildings and construction sites.

    • Augmented Reality (AR) ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be up to date in your profession

Interview Questionnaire 

3 Questions

  • Q1. What is a bridge
  • Ans. 

    A bridge is a structure that is built to span physical obstacles such as rivers, valleys, or roads.

    • Bridges are designed to support the weight of vehicles, pedestrians, or trains.

    • They are typically made of materials such as concrete, steel, or wood.

    • Bridges can be classified into different types based on their design, such as beam bridges, arch bridges, suspension bridges, or cable-stayed bridges.

    • They play a crucial role...

  • Answered by AI
  • Q2. Least count of staff
  • Ans. 

    The least count of staff refers to the minimum number of staff required to efficiently manage and supervise a construction site.

    • The least count of staff is determined based on the size and complexity of the construction project.

    • It is important to have enough staff to ensure proper coordination, safety, and productivity on the site.

    • Factors to consider when determining the least count of staff include the scope of work, ...

  • Answered by AI
  • Q3. Full form of jcb
  • Ans. 

    JCB stands for Joseph Cyril Bamford, a British multinational corporation that manufactures construction equipment.

    • JCB is a well-known brand in the construction industry.

    • It is a British company that specializes in manufacturing construction equipment.

    • JCB produces a wide range of machinery, including excavators, backhoe loaders, and telescopic handlers.

    • The company was founded in 1945 by Joseph Cyril Bamford.

    • JCB equipment...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be calm and take your time to give answer

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

Tell us how to improve this page.

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
703 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview