Nagarjuna Construction Company Senior Project Manager Interview Questions and Answers

Updated 13 Feb 2023

Nagarjuna Construction Company Senior Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Ans. 

    Lap is used in the center of a column or Zone B for structural stability and reinforcement.

    • Lap joints provide additional strength and stability to the column.

    • They help in distributing the load evenly across the column.

    • Lap joints prevent the column from cracking or failing under heavy loads.

    • Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.

    • By using lap in the...

  • Answered by AI
  • Q2. Where are construction joint is provide in simply supported slab?
  • Ans. 

    Construction joints are provided at mid-span of simply supported slabs.

    • Construction joints are provided to allow for differential movement between adjacent sections of the slab.

    • They are typically located at mid-span of the slab, where the bending moment is zero.

    • The joint should be designed to transfer shear and moment between the two sections of the slab.

    • Proper reinforcement detailing is necessary to ensure the joint f...

  • Answered by AI
  • Q3. L/6 or L/ 3 where L is sapan of slab
  • Ans. 

    L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

    • L/6 is used for residential buildings while L/3 is used for commercial buildings.

    • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

    • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview

Interview questions from similar companies

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How to improve profitability
  • Ans. 

    To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.

    • Identify and eliminate unnecessary expenses

    • Increase sales through marketing strategies or expanding product offerings

    • Streamline operations to reduce waste and improve efficiency

  • Answered by AI

I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mostly technical related to the job position and expectancy of the organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Value proposition to the organisation should be taken care of.

Interview Questionnaire 

2 Questions

  • Q1. Work experience
  • Q2. Explain about project worked and speicificatins,finicial
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource management, quality control and quality assurance, ...
Round 2 - Group Discussion 

Already talked to you

Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Senior Project Manager interview?
Nagarjuna Construction Company interview process usually has 2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Resume Shortlist and Technical.
What are the top questions asked in Nagarjuna Construction Company Senior Project Manager interview?

Some of the top questions asked at the Nagarjuna Construction Company Senior Project Manager interview -

  1. Why we are use lap in centre of column or Zone...read more
  2. Where are construction joint is provide in simply supported sl...read more
  3. L/6 or L/ 3 where L is sapan of s...read more

Tell us how to improve this page.

Nagarjuna Construction Company Senior Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Nagarjuna Construction Company Senior Project Manager Salary
based on 54 salaries
₹13.5 L/yr - ₹22.5 L/yr
31% less than the average Senior Project Manager Salary in India
View more details

Nagarjuna Construction Company Senior Project Manager Reviews and Ratings

based on 19 reviews

4.2/5

Rating in categories

2.7

Skill development

3.4

Work-life balance

3.1

Salary

3.8

Job security

3.8

Company culture

3.0

Promotions

3.5

Work satisfaction

Explore 19 Reviews and Ratings
Junior Engineer
875 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
790 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Junior Engineer Civil
459 salaries
unlock blur

₹1.8 L/yr - ₹6.5 L/yr

Senior Engineer
359 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Civil Site Engineer
258 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview