I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. IS Code of MEP materials
  • Ans. 

    IS Code of MEP materials refers to the Indian Standards for Mechanical, Electrical, and Plumbing materials.

    • IS Codes are set by the Bureau of Indian Standards (BIS) to ensure quality and safety in construction projects.

    • Examples of IS Codes for MEP materials include IS 1239 for steel tubes, IS 732 for PVC insulated cables, and IS 783 for PVC pipes.

    • Adherence to IS Codes is mandatory in India for construction projects to m

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - is code

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource management, quality control and quality assurance, ...
Round 2 - Group Discussion 

Already talked to you

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Steel consumption of various capacities of over head tank
  • Ans. 

    Steel consumption for overhead tanks varies based on capacity, design, and material thickness.

    • Steel consumption increases with larger tank capacities

    • Thicker steel material will require more consumption

    • Design factors such as reinforcements also impact steel usage

  • Answered by AI
  • Q2. Grade of steel and cement
  • Ans. 

    Grade of steel and cement refers to the quality and strength of the materials used in construction projects.

    • Grade of steel is determined by its chemical composition and physical properties, such as yield strength and tensile strength.

    • Common grades of steel used in construction include ASTM A36, ASTM A572, and ASTM A992.

    • Grade of cement refers to its compressive strength and fineness.

    • Common grades of cement used in const...

  • Answered by AI
  • Q3. Class of di pipes
  • Ans. 

    Ductile Iron (DI) pipes are a type of iron pipe known for their high strength and durability.

    • DI pipes are made from ductile iron, which is a type of cast iron that has been treated while molten to change its carbon content, resulting in a more flexible and less brittle material.

    • They are commonly used for water and sewage transportation due to their corrosion resistance and ability to withstand high pressure.

    • DI pipes co...

  • Answered by AI
  • Q4. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves multiple steps to remove impurities and make water safe for consumption.

    • Coagulation and flocculation to remove suspended particles

    • Sedimentation to settle out floc

    • Filtration to remove remaining particles

    • Disinfection with chlorine or other chemicals to kill bacteria and viruses

    • pH adjustment to ensure water is not too acidic or basic

  • Answered by AI
  • Q5. Type of chlorination
  • Ans. 

    Chlorination is a water treatment process that involves adding chlorine to water to disinfect it.

    • Chlorination is commonly used in water treatment plants to kill bacteria and other harmful microorganisms

    • There are different types of chlorination methods such as gas chlorination, liquid chlorination, and tablet chlorination

    • Gas chlorination involves adding chlorine gas directly into the water supply

    • Liquid chlorination invo...

  • Answered by AI
Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M
Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

Interview Questionnaire 

2 Questions

  • Q1. Work experience
  • Q2. Explain about project worked and speicificatins,finicial

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Project Manager MEP interview?
Nagarjuna Construction Company interview process usually has 1 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.2k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.7k Interviews
L&T Construction Interview Questions
4.0
 • 691 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
View all
Nagarjuna Construction Company Project Manager MEP Salary
based on 4 salaries
₹12 L/yr - ₹14.4 L/yr
11% more than the average Project Manager MEP Salary in India
View more details

Nagarjuna Construction Company Project Manager MEP Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-Life balance

2.0

Salary & Benefits

4.0

Job Security

4.0

Company culture

2.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Junior Engineer
1k salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
587 salaries
unlock blur

₹3.2 L/yr - ₹9 L/yr

Junior Engineer Civil
446 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Senior Engineer
353 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Civil Site Engineer
260 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.2
Compare

Infosys

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview