Welspun Enterprises Senior Project Engineer Interview Questions and Answers

Updated 14 Aug 2021

Welspun Enterprises Senior Project Engineer Interview Experiences

1 interview found

Interview Questionnaire 

4 Questions

  • Q1. Role and responsiblity .
  • Q2. Good knowledge of working domain .
  • Q3. Efficient for team leading
  • Ans. 

    Efficient team leading requires clear communication, delegation, and motivation.

    • Establish clear goals and expectations

    • Delegate tasks based on team members' strengths

    • Provide regular feedback and recognition

    • Encourage open communication and collaboration

    • Lead by example and maintain a positive attitude

  • Answered by AI
  • Q4. Type of projects done in past exp and what were the outcomes

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General aptitude of IQ

Round 2 - Technical 

(5 Questions)

  • Q1. QA and QC related
  • Q2. What is the criteria of acceptance of a concrete compressive strength
  • Ans. 

    Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.

    • Specified strength should be determined by the project requirements or standards.

    • Testing frequency should be established to ensure consistent quality control.

    • Acceptance criteria may include minimum strength requirements and statistical analysis.

    • Example: Specified strength of 28 MPa, testing every...

  • Answered by AI
  • Q3. What is project management
  • Ans. 

    Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.

    • Involves initiating, planning, executing, controlling, and closing a project

    • Focuses on achieving specific goals and meeting success criteria

    • Requires effective communication, coordination, and resource management

    • Utilizes tools and techniques such ...

  • Answered by AI
  • Q4. How to handle the contractor if he is not performing
  • Ans. 

    Address the issue directly with the contractor and set clear expectations for improvement.

    • Schedule a meeting with the contractor to discuss performance concerns

    • Clearly communicate the areas where the contractor is not meeting expectations

    • Set specific goals and deadlines for improvement

    • Offer support or resources to help the contractor improve

    • Consider consequences if performance does not improve, such as termination of c

  • Answered by AI
  • Q5. What do you mean By EPCcontractor
  • Ans. 

    EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.

    • EPC stands for Engineering, Procurement, and Construction

    • EPC contractors are responsible for designing, procuring materials, and constructing projects

    • They are often hired for large-scale projects such as power plants, refineries, and infrastructure project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to perform and show your ability

I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sewerage System - Design Standards
  • Ans. 

    Design standards for sewerage system

    • Design standards vary based on location and regulations

    • Consideration should be given to factors such as population density, topography, and soil type

    • Standards may include minimum pipe diameter, slope, and depth

    • Examples of design standards include ASCE 15 and EPA guidelines

  • Answered by AI
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General knowledge test

Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineer technical round
  • Q2. Technical interview
Round 3 - HR 

(2 Questions)

  • Q1. Document verification
  • Q2. Salary slip and salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Past Experience
  • Q2. Earned value management
  • Q3. MS Project basics, floats, baseline, CPM, PERT
  • Q4. Concrete Technology, BBS questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basic to details asked mostly from past experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Civil engineer 

(2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak

I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is your previous experience and what is your skill
  • Ans. 

    I have 5 years of experience as a Project Engineer Civil. My skills include project management, structural design, and construction supervision.

    • 5 years of experience as a Project Engineer Civil

    • Proficient in project management, structural design, and construction supervision

    • Managed multiple civil engineering projects from conception to completion

    • Developed and implemented project plans, budgets, and schedules

    • Collaborated...

  • Answered by AI
  • Q2. Previous project details and your expertise
  • Ans. 

    I have worked on various civil engineering projects, specializing in project management and design.

    • Managed a team of engineers and contractors to successfully complete a bridge construction project within the given timeline and budget.

    • Designed and supervised the construction of a wastewater treatment plant, ensuring compliance with environmental regulations.

    • Implemented innovative solutions to optimize the design and co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be straight and clear with your technical skills , very basic questions will be asked , majorly for civil engineers it is basic but work load will be more comparing to other consultants

Welspun Enterprises Interview FAQs

What are the top questions asked in Welspun Enterprises Senior Project Engineer interview?

Some of the top questions asked at the Welspun Enterprises Senior Project Engineer interview -

  1. Efficient for team lead...read more
  2. Good knowledge of working domai...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 736 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Saint-Gobain Interview Questions
4.0
 • 171 Interviews
AECOM Interview Questions
4.2
 • 113 Interviews
Worley Interview Questions
4.2
 • 109 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
View all
Welspun Enterprises Senior Project Engineer Salary
based on 6 salaries
₹6.5 L/yr - ₹9.7 L/yr
23% less than the average Senior Project Engineer Salary in India
View more details

Welspun Enterprises Senior Project Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.9

Skill development

3.4

Work-life balance

3.4

Salary

3.9

Job security

3.4

Company culture

3.9

Promotions

3.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
84 salaries
unlock blur

₹6 L/yr - ₹15.6 L/yr

Senior Engineer
65 salaries
unlock blur

₹5.2 L/yr - ₹10.3 L/yr

Assistant Engineer
40 salaries
unlock blur

₹2.4 L/yr - ₹6.8 L/yr

Project Engineer
33 salaries
unlock blur

₹4.4 L/yr - ₹7.5 L/yr

Deputy Manager
32 salaries
unlock blur

₹11 L/yr - ₹16.5 L/yr

Explore more salaries
Compare Welspun Enterprises with

Adani Enterprises

3.8
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview