Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

KEC International Electrical Project Engineer Interview Questions and Answers

Updated 6 Apr 2024

KEC International Electrical Project Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please clear this job satisfaction and clear selari

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake
    Interview experience
    2
    Poor
    Difficulty level
    -
    Process Duration
    -
    Result
    -

    Project Engineer Interview Questions & Answers

    ABB user image Siddharth Singh

    posted on 3 Sep 2023

    Interview experience
    3
    Average
    Difficulty level
    -
    Process Duration
    -
    Result
    Selected Selected
    Interview experience
    4
    Good
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Not Selected

    I applied via LinkedIn and was interviewed in Dec 2024. There were 2 interview rounds.

    Round 1 - Technical 

    (2 Questions)

    • Q1. Tell about yourself
    • Q2. Current work experience
    Round 2 - Case Study 

    Good experience in interview

    Interview Preparation Tips

    Interview preparation tips for other job seekers - You should study the subject 1) concrete technology
    2) soil mechanics
    3) bending moment
    Contribute & help others!
    anonymous
    You can choose to be anonymous

    KEC International Interview FAQs

    How many rounds are there in KEC International Electrical Project Engineer interview?
    KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are Technical.
    What are the top questions asked in KEC International Electrical Project Engineer interview?

    Some of the top questions asked at the KEC International Electrical Project Engineer interview -

    1. Work related for technical questi...read more
    2. Growth the achievem...read more

    Recently Viewed

    INTERVIEWS

    Dilip Buildcon

    No Interviews

    INTERVIEWS

    KEC International

    No Interviews

    INTERVIEWS

    KEC International

    No Interviews

    DESIGNATION

    INTERVIEWS

    Dilip Buildcon

    No Interviews

    INTERVIEWS

    KEC International

    No Interviews

    INTERVIEWS

    Sadbhav Engineering

    No Interviews

    INTERVIEWS

    Sadbhav Engineering

    No Interviews

    INTERVIEWS

    G R Infraprojects

    No Interviews

    INTERVIEWS

    G R Infraprojects

    No Interviews

    Tell us how to improve this page.

    KEC International Electrical Project Engineer Interview Process

    based on 2 interviews

    Interview experience

    4
      
    Good
    View more

    Interview Questions from Similar Companies

    L&T Construction Interview Questions
    4.0
     • 744 Interviews
    Tata Projects Interview Questions
    4.2
     • 427 Interviews
    Siemens Interview Questions
    4.1
     • 418 Interviews
    Thermax Limited Interview Questions
    4.1
     • 251 Interviews
    ABB Interview Questions
    4.1
     • 235 Interviews
    Dilip Buildcon Interview Questions
    4.0
     • 141 Interviews
    G R Infraprojects Interview Questions
    4.1
     • 134 Interviews
    View all
    KEC International Electrical Project Engineer Salary
    based on 28 salaries
    ₹3 L/yr - ₹8 L/yr
    At par with the average Electrical Project Engineer Salary in India
    View more details

    KEC International Electrical Project Engineer Reviews and Ratings

    based on 7 reviews

    4.5/5

    Rating in categories

    4.4

    Skill development

    3.6

    Work-life balance

    4.0

    Salary

    4.6

    Job security

    3.5

    Company culture

    3.2

    Promotions

    3.5

    Work satisfaction

    Explore 7 Reviews and Ratings
    Assistant Manager
    663 salaries
    unlock blur

    ₹5.2 L/yr - ₹18.6 L/yr

    Senior Engineer
    434 salaries
    unlock blur

    ₹4.7 L/yr - ₹13 L/yr

    Civil Engineer
    225 salaries
    unlock blur

    ₹2.2 L/yr - ₹9 L/yr

    Project Engineer
    218 salaries
    unlock blur

    ₹3 L/yr - ₹11 L/yr

    Safety Officer
    213 salaries
    unlock blur

    ₹1.8 L/yr - ₹7.8 L/yr

    Explore more salaries
    Compare KEC International with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Sterlite Power

    4.0
    Compare

    Kalpataru Projects International

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview