Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Electrical Planning Engineer Interview Questions and Answers

Updated 21 Jun 2022

Nagarjuna Construction Company Electrical Planning Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - Choose excellence and give chance to proof Tallent

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Motor type, Pump lowering, ESR piping etc.
  • Q2. Solar Specification
Round 2 - HR 

(2 Questions)

  • Q1. Notice period is negotiable
  • Q2. 30%hike on current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm, to be honest if you know about whats they ask explain them if not then leave and say sorry.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General knowlegde, Basic Aptitude, Domain Technical MCQ

Round 2 - Group Discussion 

Genx vs Genz, Altitude and comparsion

Round 3 - One-on-one 

(2 Questions)

  • Q1. Components of Transformer
  • Ans. 

    Components of a transformer include core, windings, and insulation.

    • Core: Provides a path for magnetic flux

    • Windings: Primary and secondary coils for inducing voltage

    • Insulation: Prevents short circuits and ensures safety

  • Answered by AI
  • Q2. Question based on series and parallel resistance
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Portal and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What do you know about PCB ?
  • Ans. 

    PCB stands for Printed Circuit Board, a board made of non-conductive material with conductive tracks for electronic components.

    • PCB is used to mechanically support and electrically connect electronic components using conductive pathways.

    • It is made of non-conductive material like fiberglass, with copper tracks to connect components.

    • PCBs can be single-sided, double-sided, or multi-layered depending on the complexity of th...

  • Answered by AI
  • Q2. What is the active and passive components?
  • Ans. 

    Active components require a power source to operate, while passive components do not.

    • Active components require an external power source to function, such as transistors and integrated circuits.

    • Passive components do not require an external power source, such as resistors and capacitors.

    • Active components can control the flow of electricity, while passive components simply store or dissipate energy.

    • Examples of active comp...

  • Answered by AI
  • Q3. What is the difference between resistance and capacitor?
  • Ans. 

    Resistance is the opposition to the flow of current in a circuit, while a capacitor stores and releases electrical energy.

    • Resistance limits the flow of current, while a capacitor stores and releases charge.

    • Resistance is measured in ohms, while capacitance is measured in farads.

    • Examples of resistors include carbon film resistors, while examples of capacitors include ceramic capacitors.

    • Resistance dissipates energy in the...

  • Answered by AI
  • Q4. What do you know about SMT ?
  • Ans. 

    SMT stands for Surface Mount Technology, a method of electronic component assembly where components are mounted directly onto the surface of a printed circuit board (PCB).

    • SMT components are smaller and lighter than through-hole components, allowing for higher component density on PCBs.

    • SMT components are typically mounted using solder paste and reflow soldering techniques.

    • SMT technology allows for automated assembly pro...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

C6h12o6 what's this is

Round 2 - Technical 

(2 Questions)

  • Q1. Root 3 what is this
  • Q2. 66 conversation for Roman number
Round 3 - Technical 

(2 Questions)

  • Q1. Auxin what is theis
  • Ans. 

    Auxin is a plant hormone that regulates growth and development.

    • Auxin is responsible for cell elongation and division in plants.

    • It plays a role in phototropism, gravitropism, and apical dominance.

    • Examples of auxin include indole-3-acetic acid (IAA) and synthetic auxins like 2,4-D.

  • Answered by AI
  • Q2. Iaa what is this

Interview Preparation Tips

Interview preparation tips for other job seekers - Hi
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Tell us about EOT proposal
  • Ans. 

    EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.

    • EOT stands for Extension of Time.

    • It is a formal request made by the contractor to the client or project owner.

    • The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.

    • EOT proposals are typically reviewed by the proje...

  • Answered by AI
  • Q2. How to plan 2 lacs Cum concrete in 1 year. How many RMC to deploy for the same work.
  • Ans. 

    To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.

    • Calculate daily production target by dividing total volume by number of working days in a year

    • Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed

    • Consider factors like downtime, maintenance, and transportation in your planning

  • Answered by AI
  • Q3. Tell me about family background.
  • Q4. How many company you have changed so far.
  • Q5. Tell me about some silence features of your current project and cost.

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to confident while given interview.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Planning inititation process.
  • Ans. 

    The planning initiation process involves defining the project scope, objectives, and deliverables.

    • Identify the need for planning

    • Define the project scope, objectives, and deliverables

    • Identify key stakeholders and their roles

    • Establish a project team

    • Develop a project charter or initiation document

    • Conduct a feasibility study

    • Identify risks and constraints

    • Define the planning timeline and milestones

  • Answered by AI
  • Q2. Scheduling process and details for consodering durations with reapect to productivity.
  • Ans. 

    The scheduling process involves considering durations in relation to productivity.

    • The scheduling process starts by identifying the tasks that need to be completed.

    • The duration of each task is estimated based on historical data or expert judgment.

    • Productivity levels are taken into account when determining the duration of tasks.

    • Factors such as employee skills, equipment availability, and potential bottlenecks are conside...

  • Answered by AI
  • Q3. General productivity norms Vs actual industry consoderation as per site.
  • Ans. 

    The productivity norms in planning management vary across industries and sites.

    • Productivity norms in planning management are specific to each industry and site.

    • These norms are determined based on factors such as the nature of work, resources available, and industry standards.

    • For example, in the manufacturing industry, the productivity norm for planning managers may be measured in terms of units produced per hour.

    • In the...

  • Answered by AI
  • Q4. Budgeting details - Direct and indirect cost
  • Q5. Trackers prepared for site tracking, schedule upgradation
  • Ans. 

    Trackers are prepared for site tracking and schedule upgradation.

    • Trackers are tools used to monitor and track progress on a site or project.

    • They help in keeping track of tasks, deadlines, and milestones.

    • Trackers can be in the form of spreadsheets, software, or project management tools.

    • They provide visibility into the status of various activities and help in identifying bottlenecks or delays.

    • Upgradation of schedules inv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary as explained by team members is not on time, 1 month salary will be credited in 45-60 days of every passed month.
Timings are not worthy as they have strict timings of 9:30 to 9:45 after that they will consider half day for the current day and salary will be deducted.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How steel wastage can control ?
  • Ans. 

    Steel wastage can be controlled by implementing efficient production processes, proper inventory management, and regular maintenance of equipment.

    • Implementing efficient production processes to minimize errors and reduce scrap

    • Proper inventory management to avoid overstocking and material damage

    • Regular maintenance of equipment to ensure optimal performance and prevent breakdowns

    • Training employees on proper handling and c...

  • Answered by AI
  • Q2. What is Routing?
  • Ans. 

    Routing is the process of determining the most efficient path for materials or information to flow through a production system.

    • Routing involves determining the sequence of operations and work centers through which a product will pass during manufacturing.

    • It helps in optimizing production processes by minimizing delays and maximizing efficiency.

    • Examples of routing decisions include selecting the best machine for a parti...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Sallary Negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep learning

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What are activities in toilet area
  • Ans. 

    Activities in toilet area include personal hygiene, using the toilet, and cleaning.

    • Personal hygiene activities such as washing hands, brushing teeth, and showering

    • Using the toilet for urination and defecation

    • Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash

    • Maintenance tasks like unclogging drains or fixing leaks

  • Answered by AI
  • Q2. How will you calculate %age of completion of project
  • Ans. 

    Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.

    • Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.

    • Alternatively, %age of completion can be determined by tracking completion of specific project milestones.

    • Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Plumbing work in wall and floor, wall plaster and then wall tile after that flooring
  • Ans. 

    The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.

    • Start by completing the plumbing work in the walls and floors

    • Next, apply wall plaster to smoothen the surface

    • Then, install wall tiles for a decorative finish

    • Finally, proceed with the flooring installation

  • Answered by AI
  • Q2. By EPC weightage %age
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Salary expectations
  • Q2. Brief about work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have work experience in Ahluwalia and Sapporji then join this company, other wise avoid to join.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Electrical Planning Engineer interview?
Nagarjuna Construction Company interview process usually has 2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Resume Shortlist and Group Discussion.

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
KEC International Interview Questions
4.0
 • 298 Interviews
View all
Junior Engineer
896 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
626 salaries
unlock blur

₹3.2 L/yr - ₹9 L/yr

Senior Engineer
434 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
378 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
290 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview