I applied via Referral and was interviewed in Feb 2024. There were 2 interview rounds.
Steel wastage can be controlled by implementing efficient production processes, proper inventory management, and regular maintenance of equipment.
Implementing efficient production processes to minimize errors and reduce scrap
Proper inventory management to avoid overstocking and material damage
Regular maintenance of equipment to ensure optimal performance and prevent breakdowns
Training employees on proper handling and c...
Routing is the process of determining the most efficient path for materials or information to flow through a production system.
Routing involves determining the sequence of operations and work centers through which a product will pass during manufacturing.
It helps in optimizing production processes by minimizing delays and maximizing efficiency.
Examples of routing decisions include selecting the best machine for a parti...
Top trending discussions
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 3 interview rounds.
I have extensive experience using scheduling software to create and manage project timelines.
Proficient in using popular scheduling software such as Microsoft Project, Primavera P6, and Asana
Ability to create detailed project schedules, allocate resources, and track progress
Experience in setting dependencies, milestones, and critical paths to ensure project timelines are met
Familiarity with Gantt charts and other sched
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
posted on 30 Jun 2023
I applied via Referral and was interviewed in May 2023. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I was interviewed in Oct 2022.
posted on 19 Mar 2022
posted on 11 Aug 2024
Baselines in Primavera are snapshots of the project schedule at a specific point in time, used for comparison and tracking progress.
Baselines capture the original project plan before any changes are made.
They are used as a reference point to compare actual progress against planned progress.
Baselines help in identifying deviations from the original plan and taking corrective actions.
In Primavera, baselines can be create...
To track a project in Primavera P6 on a daily basis, use the following steps.
Update progress for each activity daily
Review critical path activities regularly
Monitor resource allocation and availability
Compare planned vs. actual progress
Generate daily reports for stakeholders
Interview experience
based on 1 review
Rating in categories
Deputy Manager
568
salaries
| ₹5 L/yr - ₹17.3 L/yr |
Senior Engineer
554
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Assistant Manager
544
salaries
| ₹3.8 L/yr - ₹14.6 L/yr |
Civil Engineer
252
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power