Primavera P6 and Microsoft Project are commonly used software for scheduling in the field of planning management.
Primavera P6 is a popular software used for project scheduling and management
Microsoft Project is another widely used tool for creating schedules and tracking progress
Other software options include Smartsheet, Asana, and Trello for more collaborative scheduling needs
The sequence of erection of a structure involves planning and organizing the construction process in a logical order.
Start with site preparation and foundation work
Proceed with structural framing and roofing
Followed by exterior finishing and interior work
Finish with landscaping and final touches
Each step must be completed before moving on to the next
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
1 hour aptitude test to check your general ability. Topics are from the general maths that we studied in class 6 to 10. beyond that, some basics of english grammar and general knowledge.
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 23 Jan 2024
I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
posted on 9 Jul 2023
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for project completion
It determines the shortest possible duration for the project
Any delay in tasks on the critical path will delay the project as a whole
Activities on the critical path have zero slack or float time
Example: I...
based on 2 interviews
Interview experience
based on 27 reviews
Rating in categories
Deputy Manager
604
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
429
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
300
salaries
| ₹3 L/yr - ₹9 L/yr |
Civil Site Engineer
231
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Civil Supervisor
224
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra