Filter interviews by
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine
Initial setting time of concrete is the time taken by the concrete to reach a particular degree of stiffness.
It is the time taken by the concrete to set and harden.
It is usually measured in hours and minutes.
The initial setting time of concrete is affected by factors such as temperature, humidity, and the type of cement used.
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
Construction management involves planning, coordinating, and overseeing construction projects from start to finish.
Involves coordinating with architects, engineers, contractors, and other stakeholders
Includes scheduling, budgeting, quality control, and safety management
Responsible for ensuring projects are completed on time and within budget
Examples: creating project timelines, managing subcontractors, resolving constr
Megha Engineering & Infrastructures interview questions for designations
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions
Minimum setting time of cement is the shortest time required for cement to harden and develop strength.
Minimum setting time varies depending on the type of cement and environmental conditions.
For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.
Factors affecting setting time include temperature, water-cement ratio, and presence of additives.
Setting time can be tested using Vicat appa
Theodolite is an instrument used in surveying to measure horizontal and vertical angles.
Theodolite is used to measure angles in both horizontal and vertical planes.
It consists of a telescope mounted on a base with graduated circles for precise measurements.
Theodolite is commonly used in construction, mapping, and land surveying.
Other instruments used in surveying include total stations, levels, and GPS receivers.
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Bar Bending Schedule is a document that provides details of reinforcement steel bars used in a construction project.
It includes details like bar mark, type of bar, diameter, length, shape, and bending dimensions.
It helps in estimating the quantity of steel required for the project.
It is essential for ensuring proper reinforcement placement as per structural design.
Bar Bending Schedule is prepared based on structural dr...
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
1 Interview rounds
based on 173 reviews
Rating in categories
Senior Engineer
910
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Engineer
902
salaries
| ₹2.2 L/yr - ₹6.8 L/yr |
Associate Manager
493
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
398
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Civil Engineer
359
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company