Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensur...
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
...
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
Construction management involves planning, coordinating, and overseeing construction projects from start to finish.
Involves coordinating with architects, engineers, contractors, and other stakeholders
Includes scheduling, budgeting, quality control, and safety management
Responsible for ensuring projects are completed on time and within budget
Examples: creating project timelines, managing subcontractors, resolving constr
Megha Engineering & Infrastructures interview questions for designations
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions
Minimum setting time of cement is the shortest time required for cement to harden and develop strength.
Minimum setting time varies depending on the type of cement and environmental conditions.
For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.
Factors affecting setting time include temperature, water-cement ratio, and presence of additives.
Setting time can be tested using Vicat appa
Theodolite is an instrument used in surveying to measure horizontal and vertical angles.
Theodolite is used to measure angles in both horizontal and vertical planes.
It consists of a telescope mounted on a base with graduated circles for precise measurements.
Theodolite is commonly used in construction, mapping, and land surveying.
Other instruments used in surveying include total stations, levels, and GPS receivers.
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Bar Bending Schedule is a document that provides details of reinforcement steel bars used in a construction project.
It includes details like bar mark, type of bar, diameter, length, shape, and bending dimensions.
It helps in estimating the quantity of steel required for the project.
It is essential for ensuring proper reinforcement placement as per structural design.
Bar Bending Schedule is prepared based on structural dr...
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
1 Interview rounds
based on 173 reviews
Rating in categories
Senior Engineer
910
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Engineer
902
salaries
| ₹2.2 L/yr - ₹6.8 L/yr |
Associate Manager
493
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
398
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Civil Engineer
359
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company