I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensur...
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
...
I applied via Campus Placement and was interviewed in Sep 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine
Initial setting time of concrete is the time taken by the concrete to reach a particular degree of stiffness.
It is the time taken by the concrete to set and harden.
It is usually measured in hours and minutes.
The initial setting time of concrete is affected by factors such as temperature, humidity, and the type of cement used.
Top trending discussions
1 Interview rounds
based on 173 reviews
Rating in categories
Senior Engineer
880
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Engineer
867
salaries
| ₹2.2 L/yr - ₹6.8 L/yr |
Associate Manager
490
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
398
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Civil Engineer
359
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company