The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet struct...
Minimum setting time of cement is the shortest time required for cement to harden and develop strength.
Minimum setting time varies depending on the type of cement and environmental conditions.
For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.
Factors affecting setting time include temperature, water-cement ratio, and presence of additives.
Setting time can be tested using Vicat...
Theodolite is an instrument used in surveying to measure horizontal and vertical angles.
Theodolite is used to measure angles in both horizontal and vertical planes.
It consists of a telescope mounted on a base with graduated circles for precise measurements.
Theodolite is commonly used in construction, mapping, and land surveying.
Other instruments used in surveying include total stations, levels, and GPS receivers.
Initial setting time of concrete is the time taken by the concrete to reach a particular degree of stiffness.
It is the time taken by the concrete to set and harden.
It is usually measured in hours and minutes.
The initial setting time of concrete is affected by factors such as temperature, humidity, and the type of cement used.
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 ...
The weight of a steel bar can be calculated using the formula: weight = volume x density
Calculate the volume of the steel bar using the formula: volume = πr^2h
Determine the density of steel, which is typically around 7850 kg/m^3
Calculate the weight using the formula: weight = volume x density
Substitute the values of radius (6 mm), length (12 meters), and density into the formula to find the weight
The development length of steel can be calculated using the formula specified in the relevant design code.
The development length of steel is calculated based on the bond strength between the steel reinforcement and the concrete.
The formula for calculating the development length is typically provided in the design code being used, such as ACI 318 for American standards or Eurocode 2 for European standards.
Factors such a...
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting...
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
To cast fast and maintain quality, prioritize proper planning, use high-quality materials, ensure skilled labor, and implement quality control measures.
Proper planning is essential to streamline the casting process and avoid delays.
Use high-quality materials to ensure the durability and strength of the casted structure.
Skilled labor is crucial for precise casting and to avoid errors that may compromise quality.
Implemen...
Managing a department involves effective communication, delegation, organization, and leadership.
Establish clear goals and expectations for the department.
Communicate regularly with team members to ensure everyone is on the same page.
Delegate tasks based on individual strengths and skills.
Provide support and guidance to team members when needed.
Monitor progress and performance to address any issues promptly.
Lead by exa...
Construction management involves planning, coordinating, and overseeing construction projects from start to finish.
Involves coordinating with architects, engineers, contractors, and other stakeholders
Includes scheduling, budgeting, quality control, and safety management
Responsible for ensuring projects are completed on time and within budget
Examples: creating project timelines, managing subcontractors, resolving constr...
I appeared for an interview in Oct 2024, where I was asked the following questions.
220 kV foundations support high-voltage transmission towers, ensuring stability and safety in electrical infrastructure.
Load-Bearing Capacity: Foundations must support the weight of the tower and withstand environmental forces like wind and seismic activity.
Soil Analysis: Geotechnical studies are essential to determine soil properties and ensure the foundation design is appropriate for the site conditions.
Types of Foun...
Constructing a transformer foundation involves careful planning, design, and execution to ensure stability and safety.
Site Assessment: Evaluate soil conditions and load requirements to determine the appropriate foundation type, such as spread footing or mat foundation.
Design Specifications: Follow engineering standards and local codes to design the foundation, considering factors like transformer weight and seismic act...
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Minimum setting time of cement is the shortest time required for cement to harden and develop strength.
Minimum setting time varies depending on the type of cement and environmental conditions.
For example, ordinary Portland cement typically has a minimum setting time of 30 minutes.
Factors affecting setting time include temperature, water-cement ratio, and presence of additives.
Setting time can be tested using Vicat appa...
Theodolite is an instrument used in surveying to measure horizontal and vertical angles.
Theodolite is used to measure angles in both horizontal and vertical planes.
It consists of a telescope mounted on a base with graduated circles for precise measurements.
Theodolite is commonly used in construction, mapping, and land surveying.
Other instruments used in surveying include total stations, levels, and GPS receivers.
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Megha Engineering & Infrastructures Civil Engineer interview -
based on 22 interview experiences
Difficulty level
Duration
based on 201 reviews
Rating in categories
Engineer
990
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Senior Engineer
872
salaries
| ₹4.1 L/yr - ₹9.2 L/yr |
Associate Manager
542
salaries
| ₹6 L/yr - ₹13.7 L/yr |
Mechanical Engineer
403
salaries
| ₹2.4 L/yr - ₹6.9 L/yr |
Store Executive
358
salaries
| ₹2.1 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies