i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
Infrastructure development involves planning, designing, constructing, and maintaining physical structures and facilities.
Infrastructure development includes transportation systems, buildings, water supply networks, and communication networks.
Techniques used in infrastructure development include project management, cost estimation, risk assessment, and environmental impact assessment.
Examples of infrastructure developm...
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
I applied via Company Website and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 30 Dec 2024
I am fascinated by the impact Civil Lines have on urban development and infrastructure.
The opportunity to contribute to the design and construction of roads, bridges, and buildings
The challenge of ensuring safety and efficiency in infrastructure projects
The chance to work on projects that improve the quality of life for communities
The satisfaction of seeing tangible results of your work, such as a new bridge connecting
I was impressed by your company's reputation for innovative projects and commitment to sustainability.
Reputation for innovative projects
Commitment to sustainability
Positive reviews from current employees
Company's values align with my own
Opportunities for professional growth and development
posted on 30 Jan 2025
I was interviewed in Jul 2024.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹6.5 L/yr - ₹18 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Manager
1.3k
salaries
| ₹9 L/yr - ₹30 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹16.7 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra