Larsen & Toubro Limited Sr.Engineer-Projects Interview Questions and Answers

Updated 3 Apr 2023

Larsen & Toubro Limited Sr.Engineer-Projects Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Infrastructure development and its techniques.
  • Ans. 

    Infrastructure development involves planning, designing, constructing, and maintaining physical structures and facilities.

    • Infrastructure development includes transportation systems, buildings, water supply networks, and communication networks.

    • Techniques used in infrastructure development include project management, cost estimation, risk assessment, and environmental impact assessment.

    • Examples of infrastructure developm...

  • Answered by AI
  • Q2. Questions related to my work previous experience .

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare what's shown on resume and having sufficient technical knowledge.
Round 1 - Technical 

(2 Questions)

  • Q1. Introduce yourself in breif?
  • Q2. Just prepare a good introduction where you'll be speaking about yourself for 4-5 min and that's it.

Interview Preparation Tips

Interview preparation tips for other job seekers - The rest they just ask basics about the technology you mentioned in your resume

Sr.Engineer-Projects Interview Questions Asked at Other Companies

Q1. What is the procedure to define one way and two way slab.How you ... read more
Q2. 1.Sequence from excavation to structure completion. 2.If you have ... read more
Q3. Which grade of concrete normal use for rcc
Q4. What is the duration for deshuttering a beam of span 4 mtr
Q5. Before starting tiles work what kind of checking you will do

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Site exicutive civil
Round 3 - Technical 

(1 Question)

  • Q1. Civil finishing internal

Interview Preparation Tips

Topics to prepare for Tata Projects Sr.Engineer-Projects interview:
  • Civil Construction
Interview preparation tips for other job seekers - Good company I am trying job my experience used & good Quality work completion.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Sr.Engineer-Projects interview?
Larsen & Toubro Limited interview process usually has 1-2 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Technical and Resume Shortlist.

Tell us how to improve this page.

Larsen & Toubro Limited Sr.Engineer-Projects Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 458 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Dilip Buildcon Interview Questions
4.0
 • 149 Interviews
View all
Larsen & Toubro Limited Sr.Engineer-Projects Salary
based on 12 salaries
₹5 L/yr - ₹9 L/yr
22% less than the average Sr.Engineer-Projects Salary in India
View more details

Larsen & Toubro Limited Sr.Engineer-Projects Reviews and Ratings

based on 13 reviews

4.4/5

Rating in categories

4.1

Skill development

3.9

Work-life balance

4.0

Salary

4.4

Job security

3.8

Company culture

3.7

Promotions

4.0

Work satisfaction

Explore 13 Reviews and Ratings
Assistant Manager
3.9k salaries
unlock blur

₹5.3 L/yr - ₹18.4 L/yr

Senior Engineer
3.5k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.3 L/yr

Manager
1.1k salaries
unlock blur

₹9 L/yr - ₹29 L/yr

Assistant Construction Manager
1k salaries
unlock blur

₹6 L/yr - ₹21.5 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview