I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
To manage finishing activity, plan and monitor project completion
Create a detailed project plan with timelines and milestones
Assign responsibilities and roles to team members
Monitor progress regularly and make adjustments as needed
Ensure quality control measures are in place
Communicate with stakeholders regularly to keep them informed
Use project management software to track progress and manage tasks
Conduct regular meet...
Before starting tiles work, I will check the surface for any cracks, levelness, and moisture content.
Check for any cracks or damages on the surface
Ensure the surface is level and free from any bumps or depressions
Check the moisture content of the surface to ensure it is within acceptable limits
Verify that the surface is clean and free from any debris or contaminants
Check the type of adhesive and grout to be used and en
The duration of a single project varies depending on its complexity and scope.
The duration of a project can range from a few weeks to several years.
Factors that influence project duration include project size, resources allocated, and project management efficiency.
It is important to consider potential delays and unforeseen circumstances that may impact project timelines.
Examples of project durations: 3 months for a sma...
The number of cail cables required for a 2bhk flat depends on various factors such as the size of the flat, the number of rooms, and the electrical layout.
The size of the flat and the number of rooms will determine the length of the cables required.
The electrical layout will determine the number of cables required for each room.
On average, a 2bhk flat may require around 200-300 meters of cail cable.
It is best to consul...
Top trending discussions
I was interviewed before Oct 2021.
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
SQL queries for Oracle database
Use SELECT statement to retrieve data from tables
Use WHERE clause to filter data based on specific conditions
Use JOIN clause to combine data from multiple tables
Use GROUP BY clause to group data based on specific columns
Use ORDER BY clause to sort data in ascending or descending order
Annotation in Spring Boot is used to provide metadata about the application's components.
Annotations are used to configure Spring Boot applications and simplify development.
Annotations like @RestController, @Autowired, @RequestMapping are commonly used in Spring Boot.
Annotations help in defining the behavior of components like controllers, services, and repositories.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.
If vinay is 6 months old, how much old is his younger brother, 6 years different
About civil engineering, structure engineering, construction, bill of materials
About concrete, pro and cons
About Design Concrete
Case study leaning tower of pissa
My name is John Smith.
My first name is John
My last name is Smith
I go by the name John Smith
My name is John Smith.
Full name is John Smith
Common name
No middle name or initial
I am 28 years old.
I am currently 28 years old.
My age is 28.
I was born in 1993.
posted on 8 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
Balancing multiple projects, resource constraints, stakeholder expectations, and tight deadlines.
Prioritizing tasks based on deadlines and impact on project goals
Managing resources effectively to ensure all projects are progressing smoothly
Communicating regularly with stakeholders to manage expectations and address any concerns
Adapting to changes in project scope or requirements
Ensuring team members are motivated and a
I manage my team by setting clear goals, providing support and resources, fostering open communication, and recognizing achievements.
Set clear goals and expectations for each team member
Provide necessary support and resources to help team members succeed
Foster open communication and encourage feedback
Recognize and reward achievements to motivate team members
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Resource allocation involves assigning the right people to the right tasks at the right time to maximize efficiency.
Understand project requirements and timelines before allocating resources
Consider the skills and strengths of team members when assigning tasks
Regularly monitor and adjust resource allocation based on project progress
Use tools like Gantt charts or project management software to track resource utilization
C...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Project Manager
7
salaries
| ₹9.6 L/yr - ₹12.7 L/yr |
Assistant Manager
6
salaries
| ₹5.6 L/yr - ₹7.5 L/yr |
Site Engineer
5
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Design Engineer
4
salaries
| ₹4.6 L/yr - ₹7.2 L/yr |
Senior Engineer
4
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
DLF
Godrej Properties
Prestige Group
Sobha