I appeared for an interview in Dec 2024.
Monitoring construction and real estate progress is crucial for timely completion and quality assurance.
Regular site visits to check progress and quality of work
Reviewing project timelines and milestones
Ensuring compliance with building codes and regulations
Coordinating with contractors and subcontractors
Tracking budget and expenses
Implementing quality control measures
Addressing any issues or delays promptly
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
To manage finishing activity, plan and monitor project completion
Create a detailed project plan with timelines and milestones
Assign responsibilities and roles to team members
Monitor progress regularly and make adjustments as needed
Ensure quality control measures are in place
Communicate with stakeholders regularly to keep them informed
Use project management software to track progress and manage tasks
Conduct regular meet...
Before starting tiles work, I will check the surface for any cracks, levelness, and moisture content.
Check for any cracks or damages on the surface
Ensure the surface is level and free from any bumps or depressions
Check the moisture content of the surface to ensure it is within acceptable limits
Verify that the surface is clean and free from any debris or contaminants
Check the type of adhesive and grout to be used and en
The duration of a single project varies depending on its complexity and scope.
The duration of a project can range from a few weeks to several years.
Factors that influence project duration include project size, resources allocated, and project management efficiency.
It is important to consider potential delays and unforeseen circumstances that may impact project timelines.
Examples of project durations: 3 months for a sma...
The number of cail cables required for a 2bhk flat depends on various factors such as the size of the flat, the number of rooms, and the electrical layout.
The size of the flat and the number of rooms will determine the length of the cables required.
The electrical layout will determine the number of cables required for each room.
On average, a 2bhk flat may require around 200-300 meters of cail cable.
It is best to consul...
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
based on 3 interviews
Interview experience
based on 33 reviews
Rating in categories
Project Manager
8
salaries
| ₹7.5 L/yr - ₹12.7 L/yr |
Assistant Manager
7
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Senior Manager
5
salaries
| ₹7.4 L/yr - ₹15 L/yr |
Site Engineer
5
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Structural Engineer
4
salaries
| ₹4.1 L/yr - ₹5.8 L/yr |
TCS
Accenture
Wipro
Cognizant