i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
To plan a route, consider factors such as distance, terrain, obstacles, and available resources.
Determine the starting and ending points of the route.
Consider the distance and time required to travel between the points.
Take into account the terrain and any obstacles that may affect the route.
Identify available resources such as roads, trails, or landmarks that can be used for navigation.
Use maps, GPS, or other navigati
posted on 20 Jun 2024
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
Interview experience
based on 1 review
Rating in categories
Assistant Manager
3.9k
salaries
| ₹6.5 L/yr - ₹18 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.6 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9 L/yr |
Manager
1.1k
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Assistant Construction Manager
1k
salaries
| ₹6 L/yr - ₹21 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra