Upload Button Icon Add office photos

Filter interviews by

L&T Construction Mechanical Construction Engineer Interview Questions and Answers

Updated 17 Aug 2022

L&T Construction Mechanical Construction Engineer Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Work experience , current salary and expected salary etc
  • Q2. Education qualification , family details ,age and some other questions.
Round 2 - Technical 

(2 Questions)

  • Q1. Work related question and it's technical working activity .
  • Q2. Installation process and it's optional working process is that possible in this job.
  • Ans. 

    Yes, installation process and its optional working process are possible in this job.

    • As a Mechanical Construction Engineer, it is your responsibility to oversee the installation process of mechanical systems and equipment.

    • You will also need to ensure that the installation process is carried out in accordance with the design specifications and safety standards.

    • In addition, you may be required to develop optional working ...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Finally interview review and interested for following

Interview Preparation Tips

Interview preparation tips for other job seekers - Continue try in which field you are batter .

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your experience
  • Ans. 

    I have over 10 years of experience in construction management, overseeing various projects from start to finish.

    • Managed multiple construction projects simultaneously

    • Coordinated with architects, engineers, and subcontractors

    • Ensured projects were completed on time and within budget

    • Implemented safety protocols and quality control measures

    • Handled project documentation and reporting

    • Led a team of construction professionals

  • Answered by AI
  • Q2. What is your project in M.Tech
  • Ans. 

    My project in M.Tech focused on sustainable construction practices using recycled materials.

    • Researched various recycled materials suitable for construction

    • Conducted experiments to test the strength and durability of these materials

    • Developed guidelines for incorporating recycled materials in construction projects

    • Collaborated with industry professionals to implement sustainable practices

    • Presented findings at conferences

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Timing punctuality,displain .

Round 2 - HR 

(1 Question)

  • Q1. Salary and appointment letter
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. How many chambers are there in an OHT
  • Ans. 

    There are typically two chambers in an overhead tank (OHT).

    • Most OHTs have two chambers - one for storing water and one for controlling the water level.

    • The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.

    • Having two chambers helps in maintaining a consistent water supply and pressure in the tank.

  • Answered by AI
  • Q2. What is the concrete and reinforcement quantity in an OHT
  • Ans. 

    The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.

    • Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.

    • Reinforcement quantity is determined by the structural design requirements for strength and durability.

    • Factors such as load capacity, water pressure, and seismic considerations also impa...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your Expected CTC
  • Ans. 

    My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.

    • My expected CTC is based on industry standards and my level of experience.

    • I am open to discussing the compensation package during the interview process.

    • I am looking for a competitive salary that reflects my skills and contributions to the company.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Past Experience & Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Clarity on Project & Job Responsibility for your Valuable Guidance
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. MR value of which mix is more DBM with VG40 or DBM with PMB
  • Ans. 

    The MR value of DBM with PMB is more than DBM with VG40.

    • MR value refers to the Marshall Stability value, which measures the strength and stability of an asphalt mix.

    • DBM stands for Dense Bituminous Macadam, VG40 and PMB are types of bitumen used in the mix.

    • DBM with PMB has a higher MR value compared to DBM with VG40 due to the improved properties of PMB.

    • PMB (Polymer Modified Bitumen) enhances the durability, flexibility...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Asked any type of fild experience questions based on civil construction fild.
Round 3 - Aptitude Test 

Questions upon aptitude.

Round 4 - Assignment 

Project details with cost.

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is your present working project and explain?
  • Ans. 

    I am currently working on a high-rise residential building project in downtown area.

    • Managing subcontractors and ensuring project timelines are met

    • Coordinating with architects and engineers for design changes

    • Overseeing quality control and safety measures on site

    • Communicating progress updates to stakeholders

  • Answered by AI
  • Q2. Why you are leaving present working organisation?
  • Ans. 

    Seeking new challenges and growth opportunities in a larger construction firm.

    • Desire for career advancement

    • Opportunity for professional development

    • Seeking new challenges

    • Interested in larger projects and responsibilities

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. How much you are expecting salary?
  • Ans. 

    I am expecting a competitive salary based on my experience, skills, and the responsibilities of the role.

    • Research the average salary for Assistant Construction Managers in your area to have a realistic expectation.

    • Consider your years of experience, relevant skills, and any additional qualifications that may warrant a higher salary.

    • Be prepared to negotiate based on the responsibilities and scope of the role.

    • Provide a sa...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to your cv and your work of knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - All people do hard work with full of integrity one day you will success in your dream
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Apr 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Waste to attend the interview
  • Q2. Waste to energy
Round 3 - Technical 

(2 Questions)

  • Q1. Waste to attend the interview
  • Q2. Waste of energy and time
  • Ans. 

    Waste of energy and time can occur due to poor planning, lack of communication, inefficient processes, and procrastination.

    • Poor planning can lead to rework and delays in construction projects.

    • Lack of communication can result in misunderstandings and mistakes that require additional time and resources to fix.

    • Inefficient processes can cause workers to spend more time than necessary on tasks, wasting energy and time.

    • Procr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't attend for interview

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Mechanical Construction Engineer interview?
L&T Construction interview process usually has 3 rounds. The most common rounds in the L&T Construction interview process are HR and Technical.
What are the top questions asked in L&T Construction Mechanical Construction Engineer interview?

Some of the top questions asked at the L&T Construction Mechanical Construction Engineer interview -

  1. Installation process and it's optional working process is that possible in this...read more
  2. Work related question and it's technical working activit...read more
  3. Finally interview review and interested for follow...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 400 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 128 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
662 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
528 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
383 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview