I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
posted on 22 Feb 2021
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 7 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
Timing punctuality,displain .
posted on 26 Sep 2023
Questions upon aptitude.
Project details with cost.
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 22 Feb 2021
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 19 Jan 2024
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
posted on 11 Aug 2021
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
posted on 15 Sep 2023
I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.
Interview experience
Engineer
202
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
141
salaries
| ₹3.5 L/yr - ₹9.7 L/yr |
Civil Engineer
79
salaries
| ₹2.1 L/yr - ₹6 L/yr |
Store Keeper
79
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Site Engineer
76
salaries
| ₹2 L/yr - ₹5.5 L/yr |
IRB Infrastructure
Reliance Infrastructure
GMR Group
Larsen & Toubro Limited