Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Civil Engineer Interview Questions, Process, and Tips

Updated 5 Feb 2025

Top L&T Construction Civil Engineer Interview Questions and Answers

View all 9 questions

L&T Construction Civil Engineer Interview Experiences

25 interviews found

I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What's about civil engineer's aim
  • Ans. 

    The aim of a civil engineer is to design, construct, and maintain infrastructure that improves the quality of life for society.

    • Designing and planning infrastructure projects such as roads, bridges, and buildings

    • Ensuring the safety and functionality of structures

    • Managing construction projects and overseeing the work of contractors

    • Using innovative techniques and materials to improve efficiency and sustainability

    • Contribut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. computer science related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Civil Engineer Interview Questions & Answers

user image Anupam Das

posted on 13 Jun 2023

Interview experience
4
Good
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via campus placement at Contai Polytechnic, Contai and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Computer Based Test 

(1 Question)

  • Q1. Series, Mirror Images, Non-verbal Reasoning
Round 3 - Technical 

(1 Question)

  • Q1. How much water should be absorbed for 1st class brick?
  • Ans. 

    Water absorption for 1st class brick should be less than 20%.

    • Water absorption for 1st class brick should be less than 20%.

    • Excessive water absorption can lead to structural issues and decrease the durability of the brick.

    • Water absorption can be determined by soaking the brick in water for a specified period and measuring the weight difference before and after soaking.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Engineer interview:
  • Concrete
  • Rebar
  • RCC
  • Pre-stressing
  • Civil Engineering
Interview preparation tips for other job seekers - Try to be an expert of any work.

Civil Engineer Interview Questions Asked at Other Companies

Q1. What is the curing formalities for our precast segment???
Q2. What is the lap length of steel in tension zone & compression ... read more
asked in BHEL
Q3. 1)What is the difference of contraction joint & expansion joi ... read more
asked in Lodha Group
Q4. Describe in general, the various stages in construction of reside ... read more
Q5. What is workability of concrete ?

I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Leveling layout marking and shuttering work and steel structure
  • Q2. Any civil engineer relatad

Interview Preparation Tips

Interview preparation tips for other job seekers - Any skill of civil engineer

Civil Engineer Interview Questions & Answers

user image Sadique Hussain

posted on 2 Jan 2021

Interview Questionnaire 

1 Question

  • Q1. How to draw an SFD and BMD for simply supported beam under UDL of 10KM/m
  • Ans. 

    To draw SFD and BMD for simply supported beam under UDL of 10KM/m, follow these steps:

    • Calculate the reactions at the supports

    • Draw the SFD by taking the upward forces as positive and starting from one end

    • Draw the BMD by taking the positive moment as clockwise and starting from one end

    • Mark the maximum values of SFD and BMD

    • Check the equilibrium and compatibility of the beam

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - They are asking so much question if you are a fresher and just passed out. They are full of field knowledge. Asked about family background too and many things which can't be explained.

L&T Construction interview questions for designations

 Civil Site Engineer

 (33)

 Senior Civil Engineer

 (7)

 Junior Engineer Civil

 (7)

 Diploma Civil Engineer

 (4)

 Construction Engineer - Civil

 (1)

 Project Engineer - Civil

 (1)

 Assistant Engineer - Civil

 (1)

 B Tech Civil Engineer

 (7)

Civil Engineer Interview Questions & Answers

user image animesh maity

posted on 25 Aug 2020

I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. WHAT IS Fe500
  • Ans. 

    Fe500 is a type of high-strength reinforcement steel used in construction.

    • Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).

    • It is commonly used in construction for its high strength and durability.

    • Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.

    • It is also known as TMT (Thermo-Mechanically Treated) s...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Get interview-ready with Top L&T Construction Interview Questions

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Civil Engineer interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and Aptitude Test.
What are the top questions asked in L&T Construction Civil Engineer interview?

Some of the top questions asked at the L&T Construction Civil Engineer interview -

  1. What is the nominal concrete proportion for different grad...read more
  2. What's about civil engineer's ...read more
  3. What is the cement reinforcement concr...read more
How long is the L&T Construction Civil Engineer interview process?

The duration of L&T Construction Civil Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Civil Engineer Interview Process

based on 33 interviews

3 Interview rounds

  • Resume Shortlist Round
  • Technical Round
  • Aptitude Test Round
View more
L&T Construction Civil Engineer Salary
based on 315 salaries
₹1.8 L/yr - ₹10.3 L/yr
21% more than the average Civil Engineer Salary in India
View more details

L&T Construction Civil Engineer Reviews and Ratings

based on 111 reviews

4.0/5

Rating in categories

4.0

Skill development

3.5

Work-life balance

4.0

Salary

4.1

Job security

3.6

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 111 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
711 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Construction Management
332 salaries
unlock blur

₹8.2 L/yr - ₹35 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview