EHS Manager Interview Questions & Answers

user image Anonymous

posted on 8 Apr 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibilities
  • Q2. What is the legal requirement
  • Ans. 

    Legal requirement for what? Please specify.

    • The question is too broad and needs to be more specific.

    • Legal requirements vary depending on the industry and location.

    • It is important to consult with legal experts to ensure compliance.

    • Examples of legal requirements include OSHA regulations, environmental laws, and labor laws.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company and keep studying hard

Do lead auditor course to build performance

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Low tension cable rating 440v
  • Ans. 

    Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.

    • Low tension cables are typically rated for voltages up to 1000V.

    • These cables are commonly used for power distribution in buildings.

    • Examples of low tension cables include PVC insulated cables and XLPE insulated cables.

  • Answered by AI
  • Q2. 11kv cable strenght and voltage

Project Manager Interview Questions & Answers

Nyati Group user image Saurabh Kumar Singh

posted on 3 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Self introduction
Round 2 - One-on-one 

(1 Question)

  • Q1. Self introduction
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Department related MEP

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Where you have worked?, what work you have done and currently what are you working on?
  • Ans. I have Worked in XYZ Company and done XYZ works in details
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. Difference between GI AND ALuminium , How tiling is done
  • Ans. 

    GI and Aluminium are two different materials used in construction. Tiling is done by laying tiles in a specific pattern.

    • GI (Galvanized Iron) is a type of steel coated with zinc to prevent rusting, while Aluminium is a lightweight metal with good corrosion resistance.

    • Tiling is done by first preparing the surface, applying adhesive, and then laying the tiles in a desired pattern.

    • Grouting is done to fill the gaps between ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. They asked about experience so far Microsoft projects experience Excel advanced level questions
  • Q2. Nothing to add here

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your experience simple
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Technical specifications about concrete activities
  • Ans. 

    Technical specifications for concrete activities involve details about the materials, processes, and equipment used.

    • Technical specifications outline the requirements for each activity

    • They include details about the materials, processes, and equipment used

    • They ensure that the project is completed to the required standards

    • Examples include the strength and composition of the concrete mix, curing time, and equipment used fo...

  • Answered by AI
  • Q2. Overall Project experience brief
  • Ans. 

    I have 10 years of project management experience in various industries.

    • Managed multiple projects simultaneously

    • Led cross-functional teams to successful project completion

    • Developed and implemented project plans, schedules, and budgets

    • Monitored project progress and ensured adherence to timelines and deliverables

    • Identified and mitigated project risks

    • Implemented project management best practices

    • Ensured effective communicat...

  • Answered by AI
  • Q3. Basic knowledge about civil engineering
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations and negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be present with formal attire, confident and knows a bit about project management process.its all easy then.

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Second round also simple no need to worry if not selected try is our best work

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic question they asked out of 5 question I answered but some of partially correct and rest thing ok , of select or not select we do not loose our strength and trying is keeping

Knight Frank Interview FAQs

How many rounds are there in Knight Frank EHS Manager interview?
Knight Frank interview process usually has 2 rounds. The most common rounds in the Knight Frank interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Knight Frank EHS Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

CBRE Interview Questions
4.2
 • 267 Interviews
InvestoXpert Interview Questions
4.2
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Smartworks Interview Questions
3.5
 • 32 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
Nyati Group Interview Questions
4.2
 • 27 Interviews
SMEC Interview Questions
3.8
 • 26 Interviews
View all

Fast track your campus placements

View all
Project Engineer
146 salaries
unlock blur

₹2.6 L/yr - ₹7.8 L/yr

Assistant Project Manager
123 salaries
unlock blur

₹5.2 L/yr - ₹12.2 L/yr

Project Manager
102 salaries
unlock blur

₹7 L/yr - ₹18.8 L/yr

Assistant Facility Manager
95 salaries
unlock blur

₹2.9 L/yr - ₹7.2 L/yr

Senior Project Engineer
83 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

My Home Constructions

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview