Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KMV Projects Limited Team. If you also belong to the team, you can get access from here

KMV Projects Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KMV Projects Limited Assistant Engineer Interview Questions and Answers

Updated 8 Mar 2025

KMV Projects Limited Assistant Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self Introduction
  • Q2. About Course Related things
Round 1 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
Round 2 - Technical 

Assistant Engineer Interview Questions Asked at Other Companies

asked in Randstad
Q1. 1.Define the term capacitance & inductance 2.what is Rectifie ... read more
Q2. Why do we take only 1 set of cube sample at a casting of concrete ... read more
Q3. How do we take slump for casting of concrete and what if when we ... read more
asked in TCE
Q4. What are the provisions you check for, designing a beam/column ac ... read more
Q5. What is the 5s.and how is the important of a industry??

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. PQC rectification??
Round 2 - Technical 

(1 Question)

  • Q1. BC joint cutting??
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Prepare basics properly before going for interview, they mostly ask less questions with more depth.
  • Q2. Draw BMD for sway frame.
  • Ans. 

    BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.

    • BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.

    • The bending moment will be maximum at the points where the frame experiences maximum sway.

    • The BMD can be drawn by analyzing the internal forces and moments acting on the frame.

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Draw piperack elevations
  • Ans. 

    Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.

    • Start by determining the dimensions and layout of the piperack

    • Use software like AutoCAD to create accurate and detailed drawings

    • Include all necessary details such as pipe sizes, supports, and connections

    • Label all components clearly for easy understanding

    • Review and revise the drawings as needed for accuracy

  • Answered by AI
  • Q2. Anchor bolt design
  • Q3. Base plate design
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I appeared for an interview in Apr 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Control Valve sizing
  • Q2. Flowmeter selection
Round 2 - HR 

(2 Questions)

  • Q1. Reason for shifting
  • Ans. 

    I shifted to pursue new opportunities for growth and development in my career.

    • Seeking new challenges and responsibilities

    • Exploring different industries or technologies

    • Relocation for personal reasons or family commitments

  • Answered by AI
  • Q2. Expected salary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Bar Bending Schedule
  • Q2. Find out shuttering Area
  • Ans. 

    Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.

    • Calculate the surface area of each individual formwork used for the concrete structure

    • Add up the surface areas of all formworks to get the total shuttering area

    • Consider any openings or gaps in the formwork when calculating the area

  • Answered by AI
  • Q3. Semi circle area formula
  • Ans. 

    The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.

    • The formula for the area of a semi-circle is (1/2) * pi * r^2

    • The radius (r) is half the diameter of the circle

    • Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Why u want to join this company ?
  • Q2. Why u want to quit Your present company
  • Q3. About my Salary

KMV Projects Limited Interview FAQs

How many rounds are there in KMV Projects Limited Assistant Engineer interview?
KMV Projects Limited interview process usually has 1-2 rounds. The most common rounds in the KMV Projects Limited interview process are HR, Technical and One-on-one Round.
How to prepare for KMV Projects Limited Assistant Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KMV Projects Limited. The most common topics and skills that interviewers at KMV Projects Limited expect are Project Management and Site Execution.

Tell us how to improve this page.

KMV Projects Limited Assistant Engineer Interview Process

based on 4 interviews

Interview experience

4.3
  
Good
View more
KMV Projects Limited Assistant Engineer Salary
based on 148 salaries
₹2.1 L/yr - ₹5.9 L/yr
At par with the average Assistant Engineer Salary in India
View more details

KMV Projects Limited Assistant Engineer Reviews and Ratings

based on 44 reviews

4.1/5

Rating in categories

4.2

Skill development

3.4

Work-life balance

4.0

Salary

3.8

Job security

3.7

Company culture

3.8

Promotions

3.8

Work satisfaction

Explore 44 Reviews and Ratings
Assistant Engineer
148 salaries
unlock blur

₹2.1 L/yr - ₹5.8 L/yr

Engineer
75 salaries
unlock blur

₹3.4 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
63 salaries
unlock blur

₹1.9 L/yr - ₹5.5 L/yr

Senior Engineer
47 salaries
unlock blur

₹4.8 L/yr - ₹9.6 L/yr

Civil Site Engineer
46 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare KMV Projects Limited with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview