i
KMV Projects Limited
Filter interviews by
Top trending discussions
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
based on 4 interviews
Interview experience
based on 44 reviews
Rating in categories
Assistant Engineer
148
salaries
| ₹2.1 L/yr - ₹5.8 L/yr |
Engineer
75
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
63
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Senior Engineer
47
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Civil Site Engineer
46
salaries
| ₹2 L/yr - ₹6.3 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem