KMV Projects Limited Senior Engineer Interview Questions, Process, and Tips

Updated 16 Oct 2023

Top KMV Projects Limited Senior Engineer Interview Questions and Answers

  • Q1. Which Concrete mix using currently at your site and also how much qty of cement & fine aggregate and coarse aggregate in that ?
  • Q2. How do you calculate man power for work ?
  • Q3. How to control labor and Matireal wastage

KMV Projects Limited Senior Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Which Concrete mix using currently at your site and also how much qty of cement & fine aggregate and coarse aggregate in that ?
  • Ans. 

    We are currently using M25 grade concrete mix at our site with a ratio of 1:1:2 (cement:fine aggregate:coarse aggregate).

    • M25 grade concrete mix is being used at our site

    • The ratio of the mix is 1:1:2 (cement:fine aggregate:coarse aggregate)

    • For example, for 1 cubic meter of M25 concrete mix, we use 350 kg of cement, 700 kg of fine aggregate, and 1400 kg of coarse aggregate

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How do you calculate man power for work ?
  • Ans. 

    Man power for work can be calculated by estimating the amount of work to be done, the time required to complete it, and the efficiency of the workers.

    • Estimate the amount of work to be done

    • Determine the time required to complete the work

    • Consider the efficiency of the workers

    • Calculate the total man hours needed by dividing the total work by the productivity rate of the workers

  • Answered by AI
  • Q2. As per drawing I calculate total qty of work and by using thumb rule approximately calculate no. of man power required.

Interview Preparation Tips

Topics to prepare for KMV Projects Limited Senior Engineer interview:
  • Concrete
  • Steel
  • High Rise Building
Interview preparation tips for other job seekers - Don't fear face the interview
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Experience & CTC
Round 3 - Technical 

(1 Question)

  • Q1. Experience & Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Practice good sound in Technical subject

Senior Engineer Interview Questions Asked at Other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
asked in Nagarro
Q2. Write a program: two input, one is N(any integer, lets say 3), se ... read more
asked in Tata Elxsi
Q3. What is Quality Assurance. Difference between Quality assurance a ... read more
Q4. Is it possible to work with multiple threads in core data? If so, ... read more
Q5. When you will perform Half or Full engine overhauling.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Grades of concrete and strengths
  • Ans. 

    Grades of concrete are classified based on their compressive strength. Common grades include M10, M20, M30, etc.

    • Concrete grades are denoted by the letter 'M' followed by a number, representing the compressive strength in megapascals (MPa)

    • For example, M20 concrete has a compressive strength of 20 MPa

    • Higher grade concrete like M30 or M40 is used for structures requiring higher strength

    • Lower grade concrete like M10 is use

  • Answered by AI
  • Q2. How to control labor and Matireal wastage
  • Ans. 

    Labor and material wastage can be controlled through proper planning, monitoring, and training.

    • Implement lean manufacturing principles to reduce waste in production processes

    • Regularly monitor and analyze production data to identify areas of improvement

    • Train employees on efficient use of materials and proper handling techniques

    • Utilize inventory management systems to track material usage and minimize overstocking

    • Implemen...

  • Answered by AI
  • Q3. Lap zones in beams and columns, steel margin in footings
  • Ans. 

    Lap zones in beams and columns ensure proper reinforcement overlap for structural integrity. Steel margin in footings provides additional strength and safety.

    • Lap zones in beams and columns refer to the area where reinforcement bars overlap to ensure proper load transfer and structural integrity

    • Steel margin in footings refers to the additional steel reinforcement provided in footings to enhance strength and safety

    • Proper...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Previous salary and location

Interview questions from similar companies

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. When I services
  • Q2. Are you pass higher secondary exam?
  • Q3. What is your birthday
  • Q4. When are you pass civil engineering diploma
  • Q5. When are you pass higher secondary
  • Q6. When are you pass HSLC
  • Ans. 

    I passed HSLC in 2015.

    • I passed HSLC in 2015.

    • I completed my HSLC in 2015.

    • I cleared the HSLC examination in 2015.

  • Answered by AI
  • Q7. Are you experiencing
  • Q8. Please Adress?
  • Ans. Vill: Bagariguri , PO: Jajori , DIST.: Nagaon, pin: 782142
  • Answered by Sanjib Bordoloi
  • Q9. Your father name?

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes, share my job, I have passed civil engineering diploma in 1996 year
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Sep 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Contact to you for opportunity
Round 3 - Technical 

(4 Questions)

  • Q1. Material testing 1.Soil 2.Bitumen 3.Cement 4.Aggregate
  • Q2. Design Mix & Job Mix formula Concrete, DLC, PQC, GSB, WMM, DBM, BC
  • Q3. Others material in Finishing PEB Material
  • Ans. 

    PEB material refers to pre-engineered building materials used in finishing construction projects.

    • PEB materials are commonly used in construction projects for their durability and cost-effectiveness.

    • Examples of PEB materials include steel beams, roofing sheets, wall panels, and insulation materials.

    • Quality control is essential in ensuring that PEB materials meet industry standards and specifications.

    • Inspecting PEB mater...

  • Answered by AI
  • Q4. Rockwool, Welding, Tile, Brick work and Painting work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. What is thickness of tile
  • Ans. 

    The thickness of a tile can vary depending on the type and size of the tile being used.

    • Tile thickness typically ranges from 1/4 inch to 3/4 inch.

    • Larger tiles may have a thicker thickness to support their weight.

    • Thin tiles are often used for wall applications, while thicker tiles are used for flooring.

    • Porcelain tiles are usually thicker than ceramic tiles.

  • Answered by AI
  • Q2. What is thickness of marble
  • Ans. 

    The thickness of marble can vary depending on the type and purpose, but it is typically between 3/4 inch to 1 1/4 inches.

    • Marble thickness can range from 3/4 inch to 1 1/4 inches

    • Thicker marble is often used for countertops and flooring

    • Thinner marble may be used for wall cladding or decorative purposes

  • Answered by AI
  • Q3. Process of flooring.
  • Ans. 

    The process of flooring involves selecting the appropriate materials, preparing the subfloor, laying the flooring material, and finishing with trim.

    • Selecting the appropriate flooring material based on the location and usage (e.g. hardwood, laminate, tile, carpet)

    • Preparing the subfloor by ensuring it is clean, level, and dry

    • Laying the flooring material according to manufacturer's instructions, starting from the center o...

  • Answered by AI
  • Q4. Types of tile.and use cement ration in tile.
  • Ans. 

    Types of tiles include ceramic, porcelain, glass, and natural stone. Cement ratio in tile installation varies depending on the type of tile and substrate.

    • Types of tiles: ceramic, porcelain, glass, natural stone

    • Cement ratio varies based on tile type and substrate

    • Ceramic tiles typically require a 1:4 cement to water ratio for installation

    • Porcelain tiles may need a 1:3 cement to water ratio for proper adhesion

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Prosss of flooring
  • Ans. 

    Flooring process involves selecting materials, preparing the subfloor, installing the flooring, and finishing with trim.

    • Selecting appropriate flooring material based on budget, durability, and aesthetics (e.g. hardwood, laminate, tile, carpet)

    • Preparing the subfloor by ensuring it is clean, level, and dry before installation

    • Installing the flooring by following manufacturer's instructions and using proper tools (e.g. adh...

  • Answered by AI
  • Q2. Cement ratio use for flooring
  • Ans. 

    The cement ratio for flooring depends on the type of flooring and the strength required.

    • The typical cement ratio for standard concrete flooring is 1:2:4 (cement:sand:aggregate)

    • For high strength flooring, the ratio can be increased to 1:1.5:3

    • For decorative or polished concrete flooring, a lower water-cement ratio is used to achieve a smoother finish

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No round
Contribute & help others!
anonymous
You can choose to be anonymous

KMV Projects Limited Interview FAQs

How many rounds are there in KMV Projects Limited Senior Engineer interview?
KMV Projects Limited interview process usually has 3 rounds. The most common rounds in the KMV Projects Limited interview process are Technical, Resume Shortlist and HR.
How to prepare for KMV Projects Limited Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KMV Projects Limited. The most common topics and skills that interviewers at KMV Projects Limited expect are Execution.
What are the top questions asked in KMV Projects Limited Senior Engineer interview?

Some of the top questions asked at the KMV Projects Limited Senior Engineer interview -

  1. Which Concrete mix using currently at your site and also how much qty of cement...read more
  2. How do you calculate man power for wor...read more
  3. How to control labor and Matireal wast...read more

Recently Viewed

INTERVIEWS

Gainwell CAT

No Interviews

SALARIES

LTIMindtree

COMPANY BENEFITS

Capgemini

No Benefits

SALARIES

Saksoft

COMPANY BENEFITS

TCS

No Benefits

COMPANY BENEFITS

Capgemini

No Benefits

REVIEWS

Capgemini

No Reviews

SALARIES

NTT Data

INTERVIEWS

ARCADIS

No Interviews

SALARIES

NielsenIQ

Tell us how to improve this page.

KMV Projects Limited Senior Engineer Interview Process

based on 7 interviews

1 Interview rounds

  • Resume Shortlist Round
View more
KMV Projects Limited Senior Engineer Salary
based on 46 salaries
₹4.8 L/yr - ₹9.6 L/yr
26% less than the average Senior Engineer Salary in India
View more details

KMV Projects Limited Senior Engineer Reviews and Ratings

based on 34 reviews

4.0/5

Rating in categories

3.9

Skill development

3.6

Work-life balance

4.0

Salary

4.1

Job security

3.8

Company culture

3.9

Promotions

3.9

Work satisfaction

Explore 34 Reviews and Ratings
Assistant Engineer
149 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
74 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
63 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KMV Projects Limited with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent