KMV Projects Limited
Filter interviews by
I applied via Referral and was interviewed before Nov 2021. There were 4 interview rounds.
About your work experience and what you expect from the company
Top trending discussions
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Basic scenario based questions
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
posted on 15 Mar 2022
I applied via Newspaper Ad and was interviewed in Feb 2022. There were 4 interview rounds.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
based on 19 reviews
Rating in categories
Assistant Engineer
202
salaries
| ₹1.2 L/yr - ₹5.8 L/yr |
Engineer
72
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Assistant Engineer - Civil
63
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Senior Engineer
53
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Civil Site Engineer
47
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company