I have 5 years of site experience in QA/QC, including managing inspections, audits, and documentation.
Managed and conducted inspections to ensure compliance with project specifications
Performed quality audits to identify areas for improvement and ensure adherence to quality standards
Maintained detailed documentation of all QA/QC activities and reported findings to management
Implemented corrective actions to address non...
Top trending discussions
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
posted on 9 Nov 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,
I applied via campus placement at Shri Vidyanikethan Engineering College, Tirupati and was interviewed in Dec 2023. There was 1 interview round.
Grades of concrete refer to the strength of the concrete mix design.
Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.
Higher grade concrete has higher compressive strength and is used for structural purposes.
Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.
Slump in concrete refers to the measure of consistency of freshly mixed concrete.
Slump is determined by the amount of water in the concrete mix.
It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.
Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.
Slump test is comm...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a water cement ratio of 0.5 is commonly used ...
M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.
M20 grade concrete is commonly used in residential construction.
It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The compressive strength of M20 grade concrete is 20 MPa.
It is suitable for foundations, beams, columns, and slabs.
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 24 Aug 2024
I was interviewed before Jun 2023.
Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.
Use measuring tape and chalk to mark the layout according to the blueprint
Calculate the column ring cutting length using the formula: 2 x π x radius + height
Ensure accuracy in measurements to avoid errors in construction
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
243
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Senior Engineer
162
salaries
| ₹3.2 L/yr - ₹12.5 L/yr |
Assistant Engineer
106
salaries
| ₹3.1 L/yr - ₹8 L/yr |
Senior Executive
92
salaries
| ₹5 L/yr - ₹11 L/yr |
Manager
88
salaries
| ₹10 L/yr - ₹24 L/yr |
Tata Group
Adani Group
Reliance Industries
Mahindra & Mahindra