i
Kalpataru Limited
Filter interviews by
I was interviewed in Jan 2023.
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
posted on 9 Nov 2024
Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.
Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more
It is made by mixing cement, water, and aggregates like sand and gravel
Additives can be included to enhance specific properties of the concrete, such as strength or workability
Once mixed, concrete harden...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.
BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.
It helps in estimating the quantity of steel required for the project.
BBS is essential for ensuring the structural integrity and strength of the building.
Components of BBS include bending shapes, cutting length,
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 17 May 2022
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I have over 10 years of experience in civil engineering, managing various construction projects.
Managed construction projects from start to finish
Coordinated with architects, engineers, and contractors
Ensured projects were completed on time and within budget
Handled permits, inspections, and regulatory compliance
Implemented safety protocols and quality control measures
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
based on 2 interviews
Interview experience
based on 16 reviews
Rating in categories
Assistant Manager
215
salaries
| ₹5.4 L/yr - ₹16 L/yr |
Senior Engineer
162
salaries
| ₹3.2 L/yr - ₹12.5 L/yr |
Assistant Engineer
105
salaries
| ₹3.1 L/yr - ₹8 L/yr |
Senior Executive
92
salaries
| ₹5 L/yr - ₹11 L/yr |
Manager
88
salaries
| ₹10 L/yr - ₹24 L/yr |
Tata Group
Adani Group
Reliance Industries
Mahindra & Mahindra