Filter interviews by
posted on 12 Dec 2024
Slack is different after STA in Prime Time compared to PNR output due to timing optimizations and adjustments made during the Prime Time stage.
During Prime Time, timing optimizations are performed to meet the required timing constraints, which may result in changes to the slack values.
Prime Time stage involves detailed analysis and adjustments to improve timing closure, which can impact slack values.
PNR output is the r...
To control congestion during placement activities, strategies such as proper floorplanning, utilization of congestion-aware placement algorithms, and iterative optimization can be implemented.
Proper floorplanning to allocate enough space for critical paths and high-density areas
Utilization of congestion-aware placement algorithms to minimize congestion hotspots
Iterative optimization techniques to refine placement and a
Top trending discussions
Mux is a device that selects one of several input signals and forwards it to a single output, while a bus is a communication system that transfers data between components.
Mux is used to select one of multiple input signals and route it to a single output.
Bus is a communication system that allows multiple devices to transfer data between each other.
Mux is commonly used in digital electronics for signal routing, while bu...
Assistant Engineer
33
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Project Engineer
15
salaries
| ₹4.1 L/yr - ₹8.8 L/yr |
Junior Engineer Civil
14
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Safety Officer
13
salaries
| ₹3.1 L/yr - ₹5.5 L/yr |
Assistant Engineer - Civil
13
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
IRB Infrastructure
Ashoka Buildcon