Filter interviews by
posted on 12 Dec 2024
Slack is different after STA in Prime Time compared to PNR output due to timing optimizations and adjustments made during the Prime Time stage.
During Prime Time, timing optimizations are performed to meet the required timing constraints, which may result in changes to the slack values.
Prime Time stage involves detailed analysis and adjustments to improve timing closure, which can impact slack values.
PNR output is the r...
To control congestion during placement activities, strategies such as proper floorplanning, utilization of congestion-aware placement algorithms, and iterative optimization can be implemented.
Proper floorplanning to allocate enough space for critical paths and high-density areas
Utilization of congestion-aware placement algorithms to minimize congestion hotspots
Iterative optimization techniques to refine placement and a
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
Qualifications and class study
Gpt Infraprojects interview questions for popular designations
The question is unclear and lacks context. Please provide more information.
Please clarify the question and provide more context.
It is unclear what 'stanth of sleepar' refers to.
Without more information, it is impossible to provide a meaningful answer.
Seating of sleepers is done by proshesh method in civil engineering.
Proshesh method involves placing the sleepers on a layer of ballast and then packing the ballast around the sleepers.
The ballast is then compacted using a tamping machine to ensure proper seating of the sleepers.
Proper seating of sleepers is important to ensure stability and safety of the railway track.
The proshesh method is commonly used in railway tr
Standard seating time refers to the time period for which a person can comfortably sit without experiencing discomfort or pain.
Standard seating time varies depending on the individual's age, weight, and health conditions.
For a healthy adult, the standard seating time is around 30-60 minutes.
For elderly people or those with back problems, the standard seating time may be shorter.
Taking breaks and stretching during prolo...
Top trending discussions
posted on 21 Nov 2023
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
Good ssjjdd jdhd dhebd dhdjd dhdhe jsjs HD shhd
I am a recent graduate with a degree in Business Administration and a passion for marketing and project management.
Recent graduate with a degree in Business Administration
Passionate about marketing and project management
Strong communication and organizational skills
Experience in internships and extracurricular activities
Materials used in road construction include asphalt, concrete, gravel, and crushed stone.
Asphalt is a common material used for road surfaces due to its durability and flexibility.
Concrete is often used for highways and major roads because of its strength and longevity.
Gravel is used for rural roads and driveways as a cost-effective option.
Crushed stone is used as a base layer for roads to provide stability and drainage...
Strength required for construction of a bridge includes structural stability, load-bearing capacity, and durability.
Structural stability to withstand various forces such as wind, traffic, and seismic activity
Load-bearing capacity to support the weight of vehicles, pedestrians, and other loads
Durability to resist corrosion, weathering, and wear over time
Materials like steel, concrete, and composite materials are commonl
General instructions for building construction involve following safety regulations, using proper materials, and ensuring structural integrity.
Ensure compliance with building codes and regulations
Use quality materials to ensure durability and longevity
Follow proper construction techniques to ensure structural integrity
Ensure proper foundation and support for the building
Consider environmental factors and sustainability...
The tallest height is the highest point above a given level or surface.
Height is a measurement of how tall something is
The tallest height on Earth is the summit of Mount Everest at 29,032 feet
Height can also refer to the highest point reached by something like a rocket or airplane
posted on 16 Jan 2025
Technical questions
1. How about tractor
2. How to work tandum pump
3. Air cleaner work
Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
based on 156 reviews
Rating in categories
Assistant Engineer
33
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Project Engineer
15
salaries
| ₹4.1 L/yr - ₹8.8 L/yr |
Junior Engineer Civil
14
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Assistant Engineer - Civil
13
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Safety Officer
13
salaries
| ₹3.1 L/yr - ₹5.5 L/yr |
Nagarjuna Construction Company
Simplex Infrastructures
IRB Infrastructure
Ashoka Buildcon