I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
Gate drive selection for MOSFETs involves choosing the appropriate voltage and current levels to ensure proper switching and efficiency.
Consider the gate threshold voltage and gate capacitance of the MOSFET when selecting the drive voltage.
Choose a gate driver IC with sufficient current capability to quickly charge and discharge the gate capacitance.
Opt for a gate driver with features like under-voltage lockout and ove...
Design a Flyback converter assuming some details
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
based on 54 reviews
Rating in categories
Senior Engineer
259
salaries
| ₹15 L/yr - ₹28 L/yr |
Engineer
195
salaries
| ₹9.4 L/yr - ₹18 L/yr |
Lead Engineer
109
salaries
| ₹16.9 L/yr - ₹44 L/yr |
Associate Engineer
76
salaries
| ₹6 L/yr - ₹10 L/yr |
Engineering Manager
68
salaries
| ₹21.5 L/yr - ₹39 L/yr |
GE
Siemens
Honeywell Technology Solutions
Schneider Electric