Upload Button Icon Add office photos

Filter interviews by

Eaton India Innovation Center Associate Engineer Interview Questions and Answers

Updated 21 Oct 2024

Eaton India Innovation Center Associate Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Tell me about yourself
  • Q2. How do u design a motor
  • Ans. 

    Designing a motor involves selecting the appropriate components, determining the specifications, creating a detailed schematic, and testing the prototype.

    • Select the type of motor based on the application (e.g. DC motor, AC motor)

    • Determine the required specifications such as power rating, speed, torque, and efficiency

    • Create a detailed schematic showing the layout of components and connections

    • Select the appropriate mater...

  • Answered by AI
  • Q3. Why do you want to shift
  • Ans. 

    I want to shift to gain new experiences and challenges in a different environment.

    • Seeking new opportunities for growth and development

    • Interested in expanding my skill set

    • Looking for a change in work culture or industry

    • Want to explore different technologies or projects

  • Answered by AI
  • Q4. What challenges u have faced
  • Q5. Area of interests
  • Ans. 

    My areas of interest include software development, data analysis, and machine learning.

    • Software development

    • Data analysis

    • Machine learning

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me about yourself Favorite Subject
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself

Associate Engineer Interview Questions Asked at Other Companies

asked in Nagarro
Q1. Count Ways To Reach The N-th Stair Problem Statement You are give ... read more
asked in Nagarro
Q2. Trailing Zeros in Factorial Problem Find the number of trailing z ... read more
asked in Nagarro
Q3. Convert First Letter to Upper Case Given a string STR, transform ... read more
asked in Tata Steel
Q4. What are the test done during maintenance of a power transformer?
asked in Tata Steel
Q5. how to control the speed of an EOT crane without VFD?

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Eaton India Innovation Center Interview FAQs

How many rounds are there in Eaton India Innovation Center Associate Engineer interview?
Eaton India Innovation Center interview process usually has 1-2 rounds. The most common rounds in the Eaton India Innovation Center interview process are Technical and HR.
What are the top questions asked in Eaton India Innovation Center Associate Engineer interview?

Some of the top questions asked at the Eaton India Innovation Center Associate Engineer interview -

  1. How do u design a mo...read more
  2. Area of intere...read more

Tell us how to improve this page.

Eaton India Innovation Center Associate Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Eaton India Innovation Center Associate Engineer Salary
based on 94 salaries
₹6 L/yr - ₹12 L/yr
72% more than the average Associate Engineer Salary in India
View more details

Eaton India Innovation Center Associate Engineer Reviews and Ratings

based on 16 reviews

4.1/5

Rating in categories

4.1

Skill development

4.0

Work-life balance

4.1

Salary

4.5

Job security

4.3

Company culture

3.9

Promotions

3.9

Work satisfaction

Explore 16 Reviews and Ratings
Senior Engineer
250 salaries
unlock blur

₹14.5 L/yr - ₹30 L/yr

Engineer
209 salaries
unlock blur

₹9.4 L/yr - ₹18.5 L/yr

Lead Engineer
124 salaries
unlock blur

₹18.1 L/yr - ₹45 L/yr

Associate Engineer
94 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Engineering Manager
79 salaries
unlock blur

₹21.5 L/yr - ₹40.2 L/yr

Explore more salaries
Compare Eaton India Innovation Center with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write